logo

Sole Source Requirement 450 Ton Chiller Rental For B20128

Sector: Aerospace & Defense • Location: Warner Robins, Georgia, United States of America

Source: SAM.gov

Tender
Award Notice

The required 450-ton chiller rental service is already provided by Georgia Power Company. In 2022, Georgia Power Company provided the existing 450-ton chiller in which they delivered and set up at building 20128. The existing chiller was purchased because the base central plant, , failed in 2022. provides chilled water to most of the administrative and industrial facilities. The cost of the repair

Status
Closed
Sector
Aerospace & Defense, Power Generation (CCGT), Government, Commercial, Residential, Warehouse, Manufacturing (Industrial), Water Supply and Storage
Location
Warner Robins, Georgia, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Sole Source Requirement 450 Ton Chiller Rental For B20128

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

4 Q
The tender “Sole Source Requirement 450 Ton Chiller Rental For B20128” is a tender record in Taiyo, linked to the Aerospace & Defense sector. It is issued for works, goods, or services related to Warner Robins, Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

award notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The required 450-ton chiller rental service is already provided by Georgia Power Company. In 2022, Georgia Power Company provided the existing 450-ton chiller in which they delivered and set up at building 20128. The existing chiller was purchased because the base central plant, , failed in 2022. provides chilled water to most of the administrative and industrial facilities. The cost of the repair at was originally estimated at $ and is not expected to be completed until . While determining a solution, B20128 indicated that they had production that was down due to the lack of sufficient chilled water that was going to cost about per year and impact production in as well. Therefore, the current contract was awarded as a modification to the Loop 3 UESC project by US Army Corps of Engineers (USACE) Huntsville Energy Division. WR-ALC and AFCEC have decided to transfer contract administration of the UESC from US Army Corps of Engineers (USACE) Huntsville Energy Division to Defense Logistics Agency Energy (DLAE). DLAE does not yet have a contract in place that could be modified to keep the rental chiller through the transition from Huntsville Energy Division to DLAE. This one-year rental service will ensure B20128 has sufficient chilled water during the time of the USACE contract ending, , and DLAE starting their contract, which is expected to be placed in the .

Original sector

Real Estate and Rental and Leasing

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Warner Robins

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Aerospace & Defense, Power Generation (CCGT), Government, Commercial, Residential, Warehouse, Manufacturing (Industrial), Water Supply and Storage

Article published date

2026-07-01

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender