SOQ for Engineering Design of the 99th Street Water Transmission Phase 3
Bids closed Apr 2026 · Washington · Last reported Apr 2026
Source: Washington Purchasing Group
A ) Preliminary layout and analysis to determine the best alignment and cost estimates for the water transmission main , connection points , and potential water distribution main replacements along the project corridor . The results will form the basis of the final engineering design . B ) Preparation of all necess
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road
- Location
- Washington, United States of America
- Updated
- 3 Nov 2026
- Source
- Washington Purchasing Group
ConstructChat
Ask ConstructChat about SOQ for Engineering Design of the 99th Street Water Transmission Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A ) Preliminary layout and analysis to determine the best alignment and cost estimates for the water transmission main , connection points , and potential water distribution main replacements along the project corridor . The results will form the basis of the final engineering design . B ) Preparation of all necessary reports and applications to satisfy regulatory and permitting requirements . C ) Preparation of final engineering design documents with bid ready plans and specifications for construction . This task includes all necessary engineering reports and supplemental documents to support the design process and cost estimates . Coordination with the county and state roadway agencies and other utilities within the project limits . Documents must be fully complete , suitable for bidding purposes and meet all permitting / regulatory agencies requirements . D ) Facilitate procurement of all permits for the project . However , the Utility will pay all permit fees directly . E ) Assist the Utility ’ s project manager as needed during the bidding process by providing responses to technical questions and making changes to Plans and Specifications if necessary . F ) Provide engineering assistance during construction and a field inspector for construction inspection . G ) Survey construction staking . H ) Preparing as - built plans . The tasks outlined above may be viewed as preliminary . RFQ respondents may add or modify the tasks as they feel necessary . Respondents are encouraged to propose a design strategy that considers environmental , topographic and physical constraints ; regulatory agency requirements ; end use project and financial goals ; and the project completion schedule . The actual scope of work may vary to meet the Utility ’ s objectives . The Utility reserves the right to adjust the tasks and scope at its discretion . A detailed contract scope of work will be developed upon consultant selection . |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | Washington Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
