logo

SOQ for Engineering Design of the 99th Street Water Transmission Phase 3

Bids closed Apr 2026 · Washington · Last reported Apr 2026

Source: Washington Purchasing Group

Tender
Closed

A ) Preliminary layout and analysis to determine the best alignment and cost estimates for the water transmission main , connection points , and potential water distribution main replacements along the project corridor . The results will form the basis of the final engineering design . B ) Preparation of all necess

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road
Location
Washington, United States of America
Updated
3 Nov 2026
Source
Washington Purchasing Group

ConstructChat

Ask ConstructChat about SOQ for Engineering Design of the 99th Street Water Transmission Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “SOQ for Engineering Design of the 99th Street Water Transmission Phase 3” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Washington, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

A ) Preliminary layout and analysis to determine the best alignment and cost estimates for the water transmission main , connection points , and potential water distribution main replacements along the project corridor . The results will form the basis of the final engineering design . B ) Preparation of all necessary reports and applications to satisfy regulatory and permitting requirements . C ) Preparation of final engineering design documents with bid ready plans and specifications for construction . This task includes all necessary engineering reports and supplemental documents to support the design process and cost estimates . Coordination with the county and state roadway agencies and other utilities within the project limits . Documents must be fully complete , suitable for bidding purposes and meet all permitting / regulatory agencies requirements . D ) Facilitate procurement of all permits for the project . However , the Utility will pay all permit fees directly . E ) Assist the Utility ’ s project manager as needed during the bidding process by providing responses to technical questions and making changes to Plans and Specifications if necessary . F ) Provide engineering assistance during construction and a field inspector for construction inspection . G ) Survey construction staking . H ) Preparing as - built plans . The tasks outlined above may be viewed as preliminary . RFQ respondents may add or modify the tasks as they feel necessary . Respondents are encouraged to propose a design strategy that considers environmental , topographic and physical constraints ; regulatory agency requirements ; end use project and financial goals ; and the project completion schedule . The actual scope of work may vary to meet the Utility ’ s objectives . The Utility reserves the right to adjust the tasks and scope at its discretion . A detailed contract scope of work will be developed upon consultant selection .

Location

Country

United States of America (USA)

State

Washington

Source

Source

Washington Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road

Article published date

2026-05-01

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender