Sources Sought for Comprehensive service coverage of a Bruker Avance III 400 MHz Nuclear Magnetic Resonance Spectrometer ( NMR ).
One of 10,000+ tenders Taiyo tracks in Maryland.
Source: Maryland Purchasing Group
Performance Work Statement ( PWS ) Service Contract for NMR Spectrometer & Related Equipment23 March 2026C . 1 BackgroundComprehensive service coverage is required to ensure continuous , uninterrupted operation of the Bruker Avance III 400 Megahertz ( MHz ) Nuclear Magnetic Resonance Spectrometer ( NMR ), in service at the Wea
- Status
- Closed
- Sector
- Road, Chemical (Industrial), Manufacturing (Industrial), Aerospace & Defense, Telecommunications, Government, Fertilizers, Broadband, Nuclear, Residential, Commercial
- Location
- Maryland, United States of America
- Updated
- 3 Nov 2026
- Source
- Maryland Purchasing Group
ConstructChat
Ask ConstructChat about Sources Sought for Comprehensive service coverage of a Bruker Avance III 400 MHz Nuclear Magnetic Resonance Spectrometer ( NMR ).
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Performance Work Statement ( PWS ) Service Contract for NMR Spectrometer & Related Equipment23 March 2026C . 1 BackgroundComprehensive service coverage is required to ensure continuous , uninterrupted operation of the Bruker Avance III 400 Megahertz ( MHz ) Nuclear Magnetic Resonance Spectrometer ( NMR ), in service at the Weapons and Materials Research Directorate of the Army Research Lab ( ARL ), Aberdeen Proving Ground ( APG ), MD . The system is equipped with broadband probes and ancillary hardware and electronics to permit acquisition of both liquids and solid samples ( i . e . magic - angle spinning , or MAS ). C . 2 ObjectiveThe NMR system is used daily by a wide variety of programs and projects , primarily to assess the outcomes of material or chemical synthesis efforts . With multiple users on any given day , a period without access to the NMR would hinder multiple research programs . A service plan is required to ensure the continued operation of the NMR , to ensure timely performance of routine maintenance , to ensure timely completion of cryogen fills , and to ensure proper function of both the liquids and solids probes . C . 3 RequirementThe respondent shall provide service and maintenance coverage of the indicated NMR system , ( Serial Number # 10215255 ), and all associated hardware , electronics , accessories , and probes . C . 3 . 1 : The contractor shall provide routine maintenance of NMR magnet , electronics , accessories , probes , and other related items ; replace consumables such as filters at recommended intervals . This includes at least one performance maintenance ( PM ) visit each year of coverage . C . 3 . 2 : The contractor shall provide a technician or engineer to assist with liquid cryogen ( liquid He ) fills as necessary , defined as liquid He level at 50 % or less . A typical fill interval is every ~ 4 . 5 months , meaning that up to three ( 3 ) fills may be required in any contract term . ARL is responsible for providing the cryogen . Weekly fills of liquid nitrogen are to be handled by ARL staff . C . 3 . 3 : The contractor shall be responsible for re - energization and setup of magnets in case of a quench event . C . 3 . 4 : The contractor shall provide on - site ( APG ) diagnostics and instrument service in case of performance degradation or component failure . Remedies may include component repair / refurbishment or component replacement as needed . C . 3 . 5 : The contractor shall provide service for probes , when necessary , either on - site ( APG ) or at the provider ’ s facility . C . 4 AT - OPSEC RequirementsC . 4 . 1 : Access and general protection / security policy and procedures . This standard language is for contractor employees with an area of performance within Army controlled installation , facility , or area . Contractor and all associated sub - contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office , Director of Emergency Services or Security Office . Contractor workforce must comply with all personal identity verification requirements ( FAR clause 52 . 204 . 9 , Personal Identify Verification of Contractor Personnel ) as directed by DoD , HQA and / or local policy . In addition to the installation change , the Government may require changes in contractor security matters or processes . C . 4 . 2 : For contractors that DO NOT require CAC but require access to a DoD facility or installation . Contractor and all associated sub - contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index ( NCIC - III ) and Terrorist Screening Database ( TSDB ) ( Army Directive 2014 - 05 / AR 190 - 13 ), applicable installation , facility and area commander installation / facility access and local Security policies and procedures ( provided by Government Representative ), or , at OCONUS locations , in accordance with status of forces agreements and other theater regulations . C . 5 Distribution StatementC . 5 . 1 : Determination of Contract Submission Documents : DISTRIBUTION STATEMENT A . Approved for public release ; distribution is unlimited . C . 5 . 2 : Determination of Information Generated from the Performance of the Contract : DISTRIBUTION STATEMENT A . Approved for public release ; distribution is unlimited . C . 6 Period of Performance ( PoP ) The Government intends to award a contract with one ( 1 ) base year plus two ( 2 ) additional option years for a total PoP of three years . The Contractor shall perform and comply with the full scope of this PWS for the option years if exercised . C . 7 Place of PerformanceThe service and maintenance coverage to be provided under this contract shall be accomplished at : Army Research Laboratory6300 Rodman Road , Building 4600Aberdeen Proving Ground , MD21005 |
Location
Country | United States of America (USA) |
State | Maryland |
Source
Source | Maryland Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Chemical (Industrial), Manufacturing (Industrial), Aerospace & Defense, Telecommunications, Government, Fertilizers, Broadband, Nuclear, Residential, Commercial |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
