logo

SOUTH OLIVE ELEMENTARY SCHOOL - ROOFING PN # 0572 - 2501

Sector: Water Supply and Storage • Location: Palm Beach, Palmbeachschools, United States of America

Source: Palm Beach Schools (PALMBEACHSCHOOLS)

Tender
Closed

The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction Budget or e

Status
Closed
Sector
Water Supply and Storage, Telecommunications, Metal, Steel, Residential, Commercial
Location
Palm Beach, Palmbeachschools, United States of America
Updated
3 Nov 2026
Source
Palm Beach Schools (PALMBEACHSCHOOLS)

ConstructChat

Ask ConstructChat about SOUTH OLIVE ELEMENTARY SCHOOL - ROOFING PN # 0572 - 2501

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “SOUTH OLIVE ELEMENTARY SCHOOL - ROOFING PN 0572 - 2501” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Palm Beach, Palmbeachschools, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction Budget or evidence bonding capacity in that amount prior to the Bid due date . The School District of Palm Beach County , Florida , will receive ( viaBidNet Direct @ www . bidnetdirect . com ) sealed Bids for : Project Name : SOUTH OLIVE ELEMENTARY SCHOOL – ROOFINGPROJECT ADDRESS : 7101 S . Olive Ave ., West Palm Beach , FL 33405ITB NO .: 26 - 57HPROJECT NO .: 0572 - 2501BIDS SHOULD BE BASED UPON THE FOLLOWING DESCRIPTION OF WORK : Roof area 71 , 920 sq / ftRe - Roofing of existing buildings no . 1Remove and replace all wet or damaged insulationCut existing membrane ( minimum every square ) Spot fasten 1 / 8 " asphaltic board into the metal deckMechanically fasten the 118 base sheet into the steelRemove all existing wall flashings , prime walls , and torch 2 piles of SBSInstall new stainless steel metal coping with A . R . B . SADDITIONAL PROJECT INFORMATION : All materials should be based on the School District Specifications , which include an approved equal . Any existing lightning protection equipment shall be removed and reinstalled . The reinstalled lightning protection system shall be re - certified in accordance with NFPA 780 , UL 96A , and Design and Material Standards Section 26 41 00 . Provide UL Master Label to the owner upon completion . Provide ( Furnish and Install ) extensions / increases , including but not limited to cabling , air terminals , down conductors , ground rods , surge protective devices at switchgear , etc . to the existing system for the re - installed system to work as a complete , operational system upon completion of the workSecurity signage is not included in this bid , and shall not be included in the pricing . The Contractor shall be responsible for the repair or replacement , including but not limited to : all surfaces , building elements , fencing , utilities , onsite and offsite elements , sidewalks , grasses , plantings , irrigation , and hardscape disturbed by and / or damaged by construction activities . If required , the Contractor will remove and / or modify chain link fencing , including adding gate ( s ), as needed for site access . Openings in the fence shall be secured at the end of each workday . Fencing is to be restored to equal or better condition upon completion of the work . All work during the summer can be completed during the day or night per the SPA / School approval . The schedule will still have to be worked out with the school as summer activities will be happening on - site . During the school year , work can be performed after the school day is completed but the schedule will have to be coordinated with school staff as there are activities at night . Holidays and weekends can be day or night work however , the Contractor will still need to coordinate with school staff & SPA as activities are sometimes scheduled during these times . All work shall be performed in accordance with the Florida Building Code 2023 , Florida Building Code 2023 8th ed , District Master Specifications , 2023 , and the ANSI / AWWA C210 ‐ 84 . Clean ‐ up and disposal of all debris generated during the Project . Final inspection to ensure compliance with building codes , manufacturer specifications , and project requirements . OWNER ’ S ALLOWANCEAn Owner ’ s Allowance of $ 96 , 800 . 00has been established for this bid . The allowance is for Buildings 6 and 7 to include a full deck replacement if needed . The allowance value of $ 96 , 800 . 00will be returned to the School District if the existing metal decking does not need to be replaced . The Bidder should not include the Owner ’ s allowance in the Bid Total , onRequired Response Form A . ATTACHMENTS100 % CD Drawings100 % SpecificationsWind Pressures Building 1Wind Pressures CalculationsSite Validation Report ( with moisture testing ) ESTABLISHED PROJECT BUDGET FOR CONSTRUCTION : $ 1 , 184 , 000 . 00The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction Budget or evidence bonding capacity in that amount prior to the Bid due date . The School District of Palm Beach County , Florida , will receive ( viaBidNet Direct @ www . bidnetdirect . com ) sealed Bids for : Project Name : SOUTH OLIVE ELEMENTARY SCHOOL – ROOFINGPROJECT ADDRESS : 7101 S . Olive Ave ., West Palm Beach , FL 33405ITB NO .: 26 - 57HPROJECT NO .: 0572 - 2501BIDS SHOULD BE BASED UPON THE FOLLOWING DESCRIPTION OF WORK : Roof area 71 , 920 sq / ftRe - Roofing of existing buildings no . 1Remove and replace all wet or damaged insulationCut existing membrane ( minimum every square ) Spot fasten 1 / 8 " asphaltic board into the metal deckMechanically fasten the 118 base sheet into the steelRemove all existing wall flashings , prime walls , and torch 2 piles of SBSInstall new stainless steel metal coping with A . R . B . SADDITIONAL PROJECT INFORMATION : All materials should be based on the School District Specifications , which include an approved equal . Any existing lightning protection equipment shall be removed and reinstalled . The reinstalled lightning protection system shall be re - certified in accordance with NFPA 780 , UL 96A , and Design and Material Standards Section 26 41 00 . Provide UL Master Label to the owner upon completion . Provide ( Furnish and Install ) extensions / increases , including but not limited to cabling , air terminals , down conductors , ground rods , surge protective devices at switchgear , etc . to the existing system for the re - installed system to work as a complete , operational system upon completion of the workSecurity signage is not included in this bid , and shall not be included in the pricing . The Contractor shall be responsible for the repair or replacement , including but not limited to : all surfaces , building elements , fencing , utilities , onsite and offsite elements , sidewalks , grasses , plantings , irrigation , and hardscape disturbed by and / or damaged by construction activities . If required , the Contractor will remove and / or modify chain link fencing , including adding gate ( s ), as needed for site access . Openings in the fence shall be secured at the end of each workday . Fencing is to be restored to equal or better condition upon completion of the work . All work during the summer can be completed during the day or night per the SPA / School approval . The schedule will still have to be worked out with the school as summer activities will be happening on - site . During the school year , work can be performed after the school day is completed but the schedule will have to be coordinated with school staff as there are activities at night . Holidays and weekends can be day or night work however , the Contractor will still need to coordinate with school staff & SPA as activities are sometimes scheduled during these times . All work shall be performed in accordance with the Florida Building Code 2023 , Florida Building Code 2023 8th ed , District Master Specifications , 2023 , and the ANSI / AWWA C210 ‐ 84 . Clean ‐ up and disposal of all debris generated during the Project . Final inspection to ensure compliance with building codes , manufacturer specifications , and project requirements . OWNER ’ S ALLOWANCEAn Owner ’ s Allowance of $ 96 , 800 . 00has been established for this bid . The allowance is for Buildings 6 and 7 to include a full deck replacement if needed . The allowance value of $ 96 , 800 . 00will be returned to the School District if the existing metal decking does not need to be replaced . The Bidder should not include the Owner ’ s allowance in the Bid Total , onRequired Response Form A . ATTACHMENTS100 % CD Drawings100 % SpecificationsWind Pressures Building 1Wind Pressures CalculationsSite Validation Report ( with moisture testing ) ESTABLISHED PROJECT BUDGET FOR CONSTRUCTION : $ 1 , 184 , 000 . 00See more

Location

Country

United States of America (USA)

State

Palmbeachschools

City

Palm Beach

Source

Source

Palm Beach Schools (PALMBEACHSCHOOLS)

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Telecommunications, Metal, Steel, Residential, Commercial

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender