SOUTH OLIVE ELEMENTARY SCHOOL - ROOFING PN # 0572 - 2501
Sector: Water Supply and Storage • Location: Palm Beach, Palmbeachschools, United States of America
Source: Palm Beach Schools (PALMBEACHSCHOOLS)
The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction Budget or e
- Status
- Closed
- Sector
- Water Supply and Storage, Telecommunications, Metal, Steel, Residential, Commercial
- Location
- Palm Beach, Palmbeachschools, United States of America
- Updated
- 3 Nov 2026
- Source
- Palm Beach Schools (PALMBEACHSCHOOLS)
ConstructChat
Ask ConstructChat about SOUTH OLIVE ELEMENTARY SCHOOL - ROOFING PN # 0572 - 2501
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction Budget or evidence bonding capacity in that amount prior to the Bid due date . The School District of Palm Beach County , Florida , will receive ( viaBidNet Direct @ www . bidnetdirect . com ) sealed Bids for : Project Name : SOUTH OLIVE ELEMENTARY SCHOOL – ROOFINGPROJECT ADDRESS : 7101 S . Olive Ave ., West Palm Beach , FL 33405ITB NO .: 26 - 57HPROJECT NO .: 0572 - 2501BIDS SHOULD BE BASED UPON THE FOLLOWING DESCRIPTION OF WORK : Roof area 71 , 920 sq / ftRe - Roofing of existing buildings no . 1Remove and replace all wet or damaged insulationCut existing membrane ( minimum every square ) Spot fasten 1 / 8 " asphaltic board into the metal deckMechanically fasten the 118 base sheet into the steelRemove all existing wall flashings , prime walls , and torch 2 piles of SBSInstall new stainless steel metal coping with A . R . B . SADDITIONAL PROJECT INFORMATION : All materials should be based on the School District Specifications , which include an approved equal . Any existing lightning protection equipment shall be removed and reinstalled . The reinstalled lightning protection system shall be re - certified in accordance with NFPA 780 , UL 96A , and Design and Material Standards Section 26 41 00 . Provide UL Master Label to the owner upon completion . Provide ( Furnish and Install ) extensions / increases , including but not limited to cabling , air terminals , down conductors , ground rods , surge protective devices at switchgear , etc . to the existing system for the re - installed system to work as a complete , operational system upon completion of the workSecurity signage is not included in this bid , and shall not be included in the pricing . The Contractor shall be responsible for the repair or replacement , including but not limited to : all surfaces , building elements , fencing , utilities , onsite and offsite elements , sidewalks , grasses , plantings , irrigation , and hardscape disturbed by and / or damaged by construction activities . If required , the Contractor will remove and / or modify chain link fencing , including adding gate ( s ), as needed for site access . Openings in the fence shall be secured at the end of each workday . Fencing is to be restored to equal or better condition upon completion of the work . All work during the summer can be completed during the day or night per the SPA / School approval . The schedule will still have to be worked out with the school as summer activities will be happening on - site . During the school year , work can be performed after the school day is completed but the schedule will have to be coordinated with school staff as there are activities at night . Holidays and weekends can be day or night work however , the Contractor will still need to coordinate with school staff & SPA as activities are sometimes scheduled during these times . All work shall be performed in accordance with the Florida Building Code 2023 , Florida Building Code 2023 8th ed , District Master Specifications , 2023 , and the ANSI / AWWA C210 ‐ 84 . Clean ‐ up and disposal of all debris generated during the Project . Final inspection to ensure compliance with building codes , manufacturer specifications , and project requirements . OWNER ’ S ALLOWANCEAn Owner ’ s Allowance of $ 96 , 800 . 00has been established for this bid . The allowance is for Buildings 6 and 7 to include a full deck replacement if needed . The allowance value of $ 96 , 800 . 00will be returned to the School District if the existing metal decking does not need to be replaced . The Bidder should not include the Owner ’ s allowance in the Bid Total , onRequired Response Form A . ATTACHMENTS100 % CD Drawings100 % SpecificationsWind Pressures Building 1Wind Pressures CalculationsSite Validation Report ( with moisture testing ) ESTABLISHED PROJECT BUDGET FOR CONSTRUCTION : $ 1 , 184 , 000 . 00The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction Budget or evidence bonding capacity in that amount prior to the Bid due date . The School District of Palm Beach County , Florida , will receive ( viaBidNet Direct @ www . bidnetdirect . com ) sealed Bids for : Project Name : SOUTH OLIVE ELEMENTARY SCHOOL – ROOFINGPROJECT ADDRESS : 7101 S . Olive Ave ., West Palm Beach , FL 33405ITB NO .: 26 - 57HPROJECT NO .: 0572 - 2501BIDS SHOULD BE BASED UPON THE FOLLOWING DESCRIPTION OF WORK : Roof area 71 , 920 sq / ftRe - Roofing of existing buildings no . 1Remove and replace all wet or damaged insulationCut existing membrane ( minimum every square ) Spot fasten 1 / 8 " asphaltic board into the metal deckMechanically fasten the 118 base sheet into the steelRemove all existing wall flashings , prime walls , and torch 2 piles of SBSInstall new stainless steel metal coping with A . R . B . SADDITIONAL PROJECT INFORMATION : All materials should be based on the School District Specifications , which include an approved equal . Any existing lightning protection equipment shall be removed and reinstalled . The reinstalled lightning protection system shall be re - certified in accordance with NFPA 780 , UL 96A , and Design and Material Standards Section 26 41 00 . Provide UL Master Label to the owner upon completion . Provide ( Furnish and Install ) extensions / increases , including but not limited to cabling , air terminals , down conductors , ground rods , surge protective devices at switchgear , etc . to the existing system for the re - installed system to work as a complete , operational system upon completion of the workSecurity signage is not included in this bid , and shall not be included in the pricing . The Contractor shall be responsible for the repair or replacement , including but not limited to : all surfaces , building elements , fencing , utilities , onsite and offsite elements , sidewalks , grasses , plantings , irrigation , and hardscape disturbed by and / or damaged by construction activities . If required , the Contractor will remove and / or modify chain link fencing , including adding gate ( s ), as needed for site access . Openings in the fence shall be secured at the end of each workday . Fencing is to be restored to equal or better condition upon completion of the work . All work during the summer can be completed during the day or night per the SPA / School approval . The schedule will still have to be worked out with the school as summer activities will be happening on - site . During the school year , work can be performed after the school day is completed but the schedule will have to be coordinated with school staff as there are activities at night . Holidays and weekends can be day or night work however , the Contractor will still need to coordinate with school staff & SPA as activities are sometimes scheduled during these times . All work shall be performed in accordance with the Florida Building Code 2023 , Florida Building Code 2023 8th ed , District Master Specifications , 2023 , and the ANSI / AWWA C210 ‐ 84 . Clean ‐ up and disposal of all debris generated during the Project . Final inspection to ensure compliance with building codes , manufacturer specifications , and project requirements . OWNER ’ S ALLOWANCEAn Owner ’ s Allowance of $ 96 , 800 . 00has been established for this bid . The allowance is for Buildings 6 and 7 to include a full deck replacement if needed . The allowance value of $ 96 , 800 . 00will be returned to the School District if the existing metal decking does not need to be replaced . The Bidder should not include the Owner ’ s allowance in the Bid Total , onRequired Response Form A . ATTACHMENTS100 % CD Drawings100 % SpecificationsWind Pressures Building 1Wind Pressures CalculationsSite Validation Report ( with moisture testing ) ESTABLISHED PROJECT BUDGET FOR CONSTRUCTION : $ 1 , 184 , 000 . 00See more |
Location
Country | United States of America (USA) |
State | Palmbeachschools |
City | Palm Beach |
Source
Source | Palm Beach Schools (PALMBEACHSCHOOLS) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Telecommunications, Metal, Steel, Residential, Commercial |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
