South Shore Pump Station Rehabilitation Phase 1
The scope, dates and status of this tender. A free account opens every field.
Source: Connecticut Purchasing Group
A . 2 . 1 Base Bid – Phase One The Contractor shall furnish all labor , materials , equipment , and incidentals necessary to perform the Base Bid at each pump station . This work shall include the following tasks : o Remove and dispose of existing wet - well piping , valves , modular sealing assembly , and supports .
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Metal
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about South Shore Pump Station Rehabilitation Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A . 2 . 1 Base Bid – Phase One The Contractor shall furnish all labor , materials , equipment , and incidentals necessary to perform the Base Bid at each pump station . This work shall include the following tasks : o Remove and dispose of existing wet - well piping , valves , modular sealing assembly , and supports . o Furnish and install new 4 - inch cement - lined ductile iron piping , valves , fittings , modular sealing assembly , and supports as shown on the drawings . o Provide and install all required gaskets , bolts , and flanges rated for wastewater service . o Conduct work in compliance with permit - required confined space entry standards . o Provide bypass pumping to maintain continuous station operation . Refer to Section F . 14 Sewage Bypass and Excess Sewage Removal Plan . o Perform hydrostatic and leak testing to verify system integrity , as outlined in Section A . 5 . 2 . o Submit testing documentation to the Town for approval . o Clean work area and restore all surfaces and equipment disturbed during installation to preconstruction condition . o Remove debris and waste materials from the site . A . 2 . 2 Alternate Bid No . 1 – Replacement of 4 - inch , 3 - Way Plug Valve Under this Alternate , the Contractor shall furnish all labor , materials , equipment , and incidentals necessary to remove and replace one ( 1 ) existing 4 - inch , 3 - way plug valves located within the valve pit at each pump station ... |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Waste Processing and Treatment, Metal |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
