Southern District Building Addition
The scope, dates and status of this tender. A free account opens every field.
Source: Missouri Purchasing Group
Provide all work shown on the project drawings for turnkey construction unless modified below . a . Guardrail shown to be removed on sheet D101 keyed note 1 will be removed by others . Electric to exterior outlets are run below grade and mounted on the guardrail . Contractor shall disconnect existing circui
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Steel, Commercial, Cement
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Southern District Building Addition
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Provide all work shown on the project drawings for turnkey construction unless modified below . a . Guardrail shown to be removed on sheet D101 keyed note 1 will be removed by others . Electric to exterior outlets are run below grade and mounted on the guardrail . Contractor shall disconnect existing circuits for guardrail removal and reconnect once building shell is constructed . New conduit and wire for reconnection may be run above or below grade as allowed by local codes . b . Remove and relocate electric on the interior as necessary for the new man door installation c . Water storage tank to be relocated on sheet D101 keyed note 4 will be relocated by others . d . Existing foundation wall along southern wall is 22 ” high with a 14 ” thick footing . The new foundation wall and footing shown on detail 4 sheet S3 . 1 shall match the height and thickness of the existing footing . Footing steps at the west and east walls will be required to provide the foundation dimensions shown on the plans . e . Contractor shall backfill the foundation excavations to meet existing grade . Concrete floor slab , concrete apron , subgrade and grading of the subgrade will be performed by others . 3 . Provide a 12 ’ x12 ’ overhead door according to the following a . Doors opening shall be field measured prior to ordering material . b . 0 . 016 ” thick roll - formed hot - dipped galvanized , ribbed face steel sections with 2 ” thick metal / foam / metal sandwich panels ... |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Steel, Commercial, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
