logo

Speed Enforcement Camera Trailers

Sector: Energy Storage • Location: Kentucky, United States of America

Source: Kentucky Purchasing Group

Tender
Closed

The selected vendor shall provide turnkey mobile speed enforcement camera trailers , including hardware , software , communications , installation support , maintenance , and data services necessary to ensure full compliance with Kentucky law . 2 . 1 Equipment Requirements Vendor must be able to provide a minimum of twelve

Status
Closed
Sector
Energy Storage, Advanced Electronics, Power Generation (CCGT), Solar, Automotive
Location
Kentucky, United States of America
Updated
3 Nov 2026
Source
Kentucky Purchasing Group

ConstructChat

Ask ConstructChat about Speed Enforcement Camera Trailers

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Speed Enforcement Camera Trailers” is a tender record in Taiyo, linked to the Energy Storage sector. It is issued for works, goods, or services related to Kentucky, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The selected vendor shall provide turnkey mobile speed enforcement camera trailers , including hardware , software , communications , installation support , maintenance , and data services necessary to ensure full compliance with Kentucky law . 2 . 1 Equipment Requirements Vendor must be able to provide a minimum of twelve 12 trailers with options to add up to twelve ( 12 ) additional units , based on Cabinet need , funding availability , and program expansion . Each enforcement trailer shall include , at minimum : 1 . Speed detection sensor system capable of accurately measuring vehicle speed to within +/- 2 mph using radar , lidar , or other sensor technologies authorized by KRS 189 . 2326 . The system must be validated and checked for accuracy every 24 hours . If the system is not validated within a 24 - hour period , it shall be shut down until validation occurs . Unit validation issues are expected to be resolved within a 48 - hour period . 2 . High - resolution imaging system capable of capturing the rear license plate of vehicles exceeding the enforcement threshold ( 11 mph or more over the posted limit ), including capability for both day and nighttime operation . 3 . Integrated illumination system , including infrared or visible flash as required for reliable image capture . Final determination on the placement of the system will be given by KYTC . 4 . System shall be capable of operating within both Enforcement and Data Collection modes . While in Enforcement mode , the system shall monitor violations and relay information to the downstream peace officer in real time while still collecting anonymized raw traffic data ( including date / time stamp , GPS location , and recorded vehicle speed ). During enforcement operations , all identifying data ( i . e ., data that is not anonymized ) collected by the device but not acted upon by the peace officer must be deleted within 30 minutes . While in Data Collection mode , the system shall monitor and collect anonymized traffic flow data without relaying information to a downstream peace officer . 5 . Automated time / date / location stamping and metadata integration . Required metadata shall include , at a minimum , the following information : # Date and time stamp # GPS location # Recorded vehicle speed # Posted speed limit # Required violation threshold ( 11 mph or more over limit , per statute ) # Trailer / device identification number 6 . Data collected during enforcement mode shall be accessible through a secure website , and the vendor shall provide login credentials ( username and password ) to law enforcement agencies to enable speed enforcement with device in real time . The website shall be accessible 7 days a week and 24 hours a day while devices are deployed . All anonymized raw traffic data ( including date / time stamp , GPS location , and recorded vehicle speed ) shall be saved on the vendor network for up to 2 years from the deployment date of the system and shall be provided to KYTC ’ s appointed point of contact monthly . 7 . Secure , encrypted communications package enabling real - time upload of violation data to the appropriate law enforcement agency digital evidence management or records management system . The radar certification must be included with the evidence package for every violation issued . 8 . Independent power supply , including solar generation and battery storage , to allow extended deployments of 7 consecutive days without external power . 9 . Tamper - resistant enclosure , locking equipment compartment , and stability features appropriate for long - term roadside placement . 10 . Remote monitoring portal for KYTC access to equipment status , uptime metrics , data throughput , and maintenance logs . The system shall also be capable of user - level access control and log tracking . 11 . Onboard event logging for system status changes , calibrations , access , and tamper alerts . 12 . Compliance with FCC , FHWA , NHTSA , and other applicable federal and state requirements for speed - measurement devices . 2 . 2 Operational Requirements Vendor shall : 1 . Support deployment statewide , including rural and urban areas , interstate corridors , and limitedaccess highways . 2 . Provide initial delivery , configuration , and commissioning of all units . Upon delivery , each unit will undergo acceptance testing by KYTC , including : # Functional testing # Speed - measurement verification # Image capture testing ( day and night ) # Communication / transfer testing # Calibration confirmation # Review of documentation Units failing acceptance may be rejected and replaced at vendor expense .

Location

Country

United States of America (USA)

State

Kentucky

Source

Source

Kentucky Purchasing Group

URL

More Details

Record type

Tender

Sector

Energy Storage, Advanced Electronics, Power Generation (CCGT), Solar, Automotive

Article published date

2026-05-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender