Spillway Vegetation Cutting And Herbicide Treatment, Sury Lake, Surry, Nh
Sector: Hydro • Location: United States of America
Source: SAM.gov
The U.S. Army Corps of Engineers – New England District is issuing a Pre-Solicitation Notice for Spillway Vegetation Cutting and Herbicide Treatment, Surry Mountain Lake, Surry, NH. QUESTIONS REGARDING THE PROCUREMENT WILL NOT BE ANSWERED DURING THE PRESOLICITATION PHASE. SUBMIT QUESTIONS TO THE CONTRACT SPECIALIST AFTER THE SOLICITATION AND ASSOCIATED DOCUMENTS HAVE BEEN POSTED. THE WORK CONSISTS
- Status
- Closed
- Sector
- Hydro, Aerospace & Defense, Waste Processing and Treatment, Residential, Water Supply and Storage, Commercial
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Spillway Vegetation Cutting And Herbicide Treatment, Sury Lake, Surry, Nh
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The U.S. Army Corps of Engineers – New England District is issuing a Pre-Solicitation Notice for Spillway Vegetation Cutting and Herbicide Treatment, Surry Mountain Lake, Surry, NH. QUESTIONS REGARDING THE PROCUREMENT WILL NOT BE ANSWERED DURING THE PRESOLICITATION PHASE. SUBMIT QUESTIONS TO THE CONTRACT SPECIALIST AFTER THE SOLICITATION AND ASSOCIATED DOCUMENTS HAVE BEEN POSTED. THE WORK CONSISTS OF: Furnish all labor, equipment, and materials necessary to cut and chemically treat approximately two (2) acres of vegetation greater than one (1) inch in diameter along the Surry Mountain Dam, Surry, NH ledge walls, and spillway floor. Woody stems less than one (1) inch in diameter do not require cutting but do require herbicide treatment. Evergreen vegetation shall be cut but do not require herbicide treatment. All vegetation debris greater than one (1) inch in diameter shall be disposed of by Contractor in accordance with local, state, and federal law. This is not a request for quotes at this time. The solicitation requirements and contract documents, to include instructions for submission, and the response date will be available on or about December 22, 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the Contract Opportunities website (www.SAM.gov). This procurement is set-aside for small business vendors. The applicable NAICS code is 561730 with a Small Business Size Standard of $9.5 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE. |
Original sector | Administrative and Support and Waste Management and Remediation Services |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Hydro, Aerospace & Defense, Waste Processing and Treatment, Residential, Water Supply and Storage, Commercial |
Article published date | 2025-12-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
