SS Richard Montgomery Mast Reduction Project
Sector: Road • Location: United Kingdom
Source: Find a Tender Service (UK)
The Department for Transport ("DfT") intends to procure a supplier to deliver mast reduction works (cutting and removal) on the SS Richard Montgomery ("SSRM"), a protected wreck located in the Thames Estuary. The contract will cover all associated works necessary to deliver mast reduction and disposal in a safe, controlled, and environmentally responsible manner. The supplier will be expected to p
- Status
- Bidding
- Sector
- Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about SS Richard Montgomery Mast Reduction Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Department for Transport ("DfT") intends to procure a supplier to deliver mast reduction works (cutting and removal) on the SS Richard Montgomery ("SSRM"), a protected wreck located in the Thames Estuary. The contract will cover all associated works necessary to deliver mast reduction and disposal in a safe, controlled, and environmentally responsible manner. The supplier will be expected to provide a full range of activities and resources necessary for the planning and execution of mast reduction on the SSRM. This is likely to encompass: • Development of a detailed methodology and plan for mast reduction. • Completion of any outstanding technical surveys (for example, geotechnical / UXO- related) required to inform safe delivery of the works. • Provision of all vessels, plant, equipment, and personnel required. • Safe cutting, lifting, and disposal (or repurposing) of the mast structures. • Effective implementation of environmental protections, health and safety measures, and UXO / pUXO management procedures. • Final clearance and demobilisation of the site. Certain activities will fall outside the scope of the contract, including those that will be undertaken by DfT or its specialist advisors in the planning, assurance, and management of the project (for example, preparatory surveys, design assurance, permit applications). A more detailed description of the intended scope of works is provided within the Request to Participate ("RTP") document to support suppliers' understanding of the requirement. A full statement of requirements, setting out the technical, operational and safety aspects of the works, will be provided as part of the tender documents during the tendering stage |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
