SS4A Demonstration Project
Sector: Road • Location: Arkansas, United States of America
Source: Arkansas Purchasing Group
Work generally includes : Installation of high - visibility crosswalk markings across side streets Installation of stop bars on side - street approaches Surface preparation and layout Temporary traffic control Coordination with City staff for scheduling and sequencing No curb , sidewalk , drainage , signal , or roadway geom
- Status
- Closed
- Sector
- Road, Car parking, Automotive
- Location
- Arkansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Arkansas Purchasing Group
ConstructChat
Ask ConstructChat about SS4A Demonstration Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Work generally includes : Installation of high - visibility crosswalk markings across side streets Installation of stop bars on side - street approaches Surface preparation and layout Temporary traffic control Coordination with City staff for scheduling and sequencing No curb , sidewalk , drainage , signal , or roadway geometry modifications are included in this scope . All crosswalks shall be ladder - style and installed at the intersections of side streets with the designated roads . The crosswalks shall consist of two ( 2 ) longitudinal transverse boundary lines with rectangular ladder bars placed perpendicular to the direction of travel . They shall extend the full width of the side - street pavement between curb faces or pavement edges and align with existing curb ramps or established travel paths . The crosswalks ' overall width shall be 8 ’ with ladder bars 6 ’ x 1 ’ and 1 ’ boundary lines . Bars shall be spaced uniformly , typically 3 ’ between bars . Ladder bars shall not extend into the gutter pan or beyond the pavement edge unless directed by the City representative . Stop bars shall be 1 ’ wide and placed on the side street approach in advance of the crosswalk . The near edge of the crosswalk shall be located a minimum of 4 ’ downstream of the stop bar unless field conditions require adjustment . Material shall be a two ( 2 ) component MMA system , mixed and applied in accordance with the manufacturer ’ s recommendations . The material shall be capable of rapid curing and reopening traffic . Surface preparation shall ensure proper bonding to existing asphalt . Contractor shall provide MMA materials that meet industry standards for durability , color stability , and performance , consistent with products such as PlastiRoute SprayPlast CSP 98 : 2 or an approved equal . |
Location
Country | United States of America (USA) |
State | Arkansas |
Source
Source | Arkansas Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Car parking, Automotive |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
