Stanley Admin Site Warehouse Bldg Heating Improvement At Sawtooth Nf
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
Project Description: This project will install new liquid propane unit heaters at the Stanley Admin Site Warehouse Building. Unit heaters shall be ceiling or wall mounted, shall connect to existing propane service, shall connect to existing electrical, and shall include new thermostat controls/wiring for operation. Installations shall include all required work to render fully operational unit heat
- Status
- Prospective
- Sector
- Water Supply and Storage, Warehouse, Raw Materials, Commercial, Residential
- Location
- Jerome, Idaho, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Stanley Admin Site Warehouse Bldg Heating Improvement At Sawtooth Nf
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project Description: This project will install new liquid propane unit heaters at the Stanley Admin Site Warehouse Building. Unit heaters shall be ceiling or wall mounted, shall connect to existing propane service, shall connect to existing electrical, and shall include new thermostat controls/wiring for operation. Installations shall include all required work to render fully operational unit heater systems along with any interior finish repairs and final cleanup from the construction activities. Project Location: This project will take place at the Stanley Ranger Station Administrative Site located just south of Stanley, Idaho. Northing and Easting coordinate locations are provided for reference on the Plans. Site Information and Limitations: The work shall be completed to limit disturbance to existing building elements and finishes. Electrical service exists at the warehouse building. Contractors may use existing electrical service during construction. Contractor shall provide connections and extensions of services as required for construction operations. Water service is also available for use at each building site via exterior hose bibbs. Restroom and sink facilities are off limits to the Contractor’s personnel. Allowable Construction Hours – 7:00 a.m. to 7:00 p.m. Monday through Saturday for all work activities. POP Dates: 6/1/2026 - 7/3/2026 |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Idaho |
City | Jerome |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Warehouse, Raw Materials, Commercial, Residential |
Article published date | 2026-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
