STATEWIDE FIRE ALARM REPLACEMENTS AND FIRE WATCH AT SUBSTANCE ABUSE TREATMENT FACILITY
The scope, dates and status of this tender. A free account opens every field.
Source: California Purchasing Group
A . CRITERIA DOCUMENTS PHASE 1 . Perform site visits at SATF and assist with the evaluation of the existing conditions when compared to the as - built drawings provided by the institution . 2 . Review of CDs to ensure the requirements for fire alarm - detection and fire suppression improvements are properly doc
- Status
- Closed
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about STATEWIDE FIRE ALARM REPLACEMENTS AND FIRE WATCH AT SUBSTANCE ABUSE TREATMENT FACILITY
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A . CRITERIA DOCUMENTS PHASE 1 . Perform site visits at SATF and assist with the evaluation of the existing conditions when compared to the as - built drawings provided by the institution . 2 . Review of CDs to ensure the requirements for fire alarm - detection and fire suppression improvements are properly documented and appropriate to convey necessary scope to the DBE . Participate in and perform value engineering and constructability reviews . 3 . Analyze CDs for construction durations , phasing and milestones required to deliver the project , and make recommendations for contract durations , phasing and milestones . 4 . Assist in the creation of RFQ for the DBE . B . DBE SELECTION 1 . Assist with the review of DBE qualifications to establish short - list . 2 . Participate in DBE interviews and selection . 3 . Assist with development of the RFP for DBEs . 4 . Review and analyze DBE proposals for complete scope , guaranteed maximum price and overall value . C . PRE - CONSTRUCTION ( DBE Design Phase ) 1 . Participate in and perform : value engineering , quality assurance reviews , and design and constructability reviews . 2 . Provide input to the DBE team at each juncture of the design review for any existing conditions conflicts or requirements . 3 . Analyze project designs for construction durations , phasing and milestones required to deliver the project and coordinate with operations at SATF , and make recommendations for contract durations , phasing , and milestones . 4 . Review construction contract general conditions and requirements for completeness and coordination . 5 . Prepare a construction project management plan ( PMP ). |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Veteran Transportation
- Countywide Vending Machine Services with Healthy Options
- Temporary Staffing Services Local and National
- NEW TIRES RETREADS AND TIRE SERVICES
- Youth Suicide Prevention Programming
