Station A Control Room HVAC Replacement and Air Quality Improvements
Bids closed Mar 2026 · California · Last reported Jan 2026
Source: California Purchasing Group
Contractor shall furnish labor , materials , equipment , services , and specialized skills to perform work involved in the Project . The Work in the Bid is defined in the Project Specifications and will generally include the following : Project Description : • Replace the two existing AC Units . • Replace and improve
- Status
- Closed
- Sector
- Broadband, Chemical (Industrial), Telecommunications, Manufacturing (Industrial)
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Station A Control Room HVAC Replacement and Air Quality Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Contractor shall furnish labor , materials , equipment , services , and specialized skills to perform work involved in the Project . The Work in the Bid is defined in the Project Specifications and will generally include the following : Project Description : • Replace the two existing AC Units . • Replace and improve duct work to improve system efficiency , flow distribution ( comfort ), air quality and prevent the formation of condensation that can damage the control room equipment . • Install air cleaning equipment that will capture sub - micron particles in addition to airborne allergens and some gases and odors ( Dust , Smoke , Pollen ). • Install Germicidal UVC lamps to control bacteria , viruses and mold spores . • Install Oxidation UVV Lamps to oxidize gases and remove odors such as smoke or other chemical gases and unpleasant odors . • Install a self - adjustable fresh air supply ( Economizer with damper ) that will provide at least 6 % of “ fresh ” filtered outside air . • One unit must always stay operational when work is performed . Equipment : • Qty . 2 : Trane Precedent 5 Ton / 460 Volt - 3 Phase - 20 Amp / Heat Pump Package Units ( WSC060H4R0A005D ); • Qty . 2 : Trane Ductwork Economizers ( BAYECON087A ); • Qty . 2 : Honeywell T10 Thermostats with Wireless Temperature Sensors ( THX321 ); • Qty . 2 : Pristine Air Polarized Media Air Cleaner ( PMAC ); Particulate Filtration ; • Qty . 2 : Pristine Air Remote Mounted UVC Lamp ; Microbiology / Viruses ; and • Qty . 2 : Pristine Air Remote Mounted UVV Lamp ; VOCs . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Broadband, Chemical (Industrial), Telecommunications, Manufacturing (Industrial) |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Broadband tenders in United States of America
- Geary Blvd. Sewer and Water Improvements
- Broadband Partnership
- Construction Manager Risk CMAR East Park P0625
- Web Content Management System Replacement
- Bay Corridor Transmission and Distribution - Phase 3 (2019) ...
- Design-Build Services for San Joaquin Valley Communication S...
- CANCELLED - Alameda Creek Recapture - Barge System Supplier ... Cost:
- 40 Gigabits per Second Collocation Switch Between VTA and Internet Service Provider Internet Point of Presence
