logo

Stationary On-Demand Nitrogen Generation System

Sector: Residential • Location: California, United States of America

Source: SAM.gov

Tender
Sources Sought

The 60th MXS has a requirement to procure a Stationary On-Demand Nitrogen Generation System to replace an end-of-life unit and support tire maintenance operations. The contractor shall provide a self-generating gaseous nitrogen generation plant capable of producing a dry nitrogen product at a purity level 99.5% at a rate of a minimum 14 Standard Cubic Feet per Minute (SCFM) with the ability to boo

Status
Closed
Sector
Residential, Aerospace & Defense, Fertilizers, Manufacturing (Industrial), Government, Commercial
Location
California, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Stationary On-Demand Nitrogen Generation System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Stationary On-Demand Nitrogen Generation System” is a tender record in Taiyo, linked to the Residential sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

sources sought

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The 60th MXS has a requirement to procure a Stationary On-Demand Nitrogen Generation System to replace an end-of-life unit and support tire maintenance operations. The contractor shall provide a self-generating gaseous nitrogen generation plant capable of producing a dry nitrogen product at a purity level 99.5% at a rate of a minimum 14 Standard Cubic Feet per Minute (SCFM) with the ability to boost outlet pressure up to 500 psig or higher with a holding tank(s) storage capacity of at a minimum: 1,000 cubic feet of nitrogen at 500 psig or greater. This system must meet all minimum specifications outlined in the Statement of Work, including producing 99.5% pure nitrogen, and includes a 2-year warranty on all parts and labor. The effort must be completed within 12 weeks of the award, and the contractor will be responsible for qualifying all Wheel and Tire technicians on the new system's setup, use, inspection, and maintenance.

Original sector

Not Identified

Location

Country

United States of America (USA)

State

California

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Residential, Aerospace & Defense, Fertilizers, Manufacturing (Industrial), Government, Commercial

Article published date

2026-02-07

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender