STILLWELL FILL AND DRAIN LINE - FUSIBLE HDPE - TOMBOY RD HILLSIDE
Bids closed Mar 2026 · Colorado · Last reported Feb 2026
Source: Town of Telluride - Colorado
Summary of WorkThe existing high pressure 10 - inch spiral wound steel fill line for the Stillwell water storage tanks has reached theend of its useful life . Since this line is to be replaced , Public Works will also replace the 4 - inch HDPE slipped insidea 6 - inch cast iron drain line for the Stillw
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Steel
- Location
- Telluride, Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- Town of Telluride - Colorado
ConstructChat
Ask ConstructChat about STILLWELL FILL AND DRAIN LINE - FUSIBLE HDPE - TOMBOY RD HILLSIDE
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Summary of WorkThe existing high pressure 10 - inch spiral wound steel fill line for the Stillwell water storage tanks has reached theend of its useful life . Since this line is to be replaced , Public Works will also replace the 4 - inch HDPE slipped insidea 6 - inch cast iron drain line for the Stillwell water storage tanks . The fill and drain lines to be installed in the TomboyRd . hillside are to be installed in the same trench for the first 500 - LF . The preferred trench design is 48 - inches inwidth . The average slope of the Tomboy Rd hillside is approximately 60 %. An excavator anchoring and safety planwill be required in coordination with the awarded contractor , Town of Telluride Public Works , and BuckhornEngineering . Public Works has identified a potential subcontractor for this work . NTP Specialty Equipment is alocal contractor with a spider excavator and is familiar with this project . NTP has installed the lower rockfall barrierfence in coordination with Public Works for this project . In terms of aboveground features , the remainder of theproject involves an intermediate attenuator fence at STA 4 + 25 , and a lower retaining wall . The awarded contractorshall facilitate fusing HDPE in adherence to the project plans and specifications . Public Works considers the timingof this project to be emergency in nature ; and will evaluate bids based on cost , start - date , crew size , and other factorsas listed in Town ’ s procurement code . The awarded contractor shall begin the project as soon as possible ( temperature and weather permitting ). No liquidated damages will be charged on this project . Replacement pipe andsome of the other related HDPE and DI components have been pre - procured as itemized in the posted Project Schedule & Summary ( page 4 of the Bid Packet and Front End Docs ). See more |
Location
Country | United States of America (USA) |
State | Colorado |
City | Telluride |
Source
Source | Town of Telluride - Colorado |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Steel |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements