Stoke-on-Trent Sustainability Park Energy Recovery Facility - Design, Build and Operate
The scope, dates and status of this tender. A free account opens every field.
Source: Open Contracting Data Standard (OCDS)
Stoke-on-Trent City Council (the Authority) seeks to procure a replacement Energy Recovery Facility (ERF) in Hanford, Stoke-on-Trent. The Authority intends to procure a new ERF with a capacity of 230,000-290,000 tonnes per annum on an 80% Council / 20% private sector ownership basis. The procurement encompasses Design and Build (D&B) and a 25-year Operations and Maintenance (O&M) contract. The Au
- Status
- Bidding
- Sector
- Power Generation (CCGT), Education
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Stoke-on-Trent Sustainability Park Energy Recovery Facility - Design, Build and Operate
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Stoke-on-Trent City Council (the Authority) seeks to procure a replacement Energy Recovery Facility (ERF) in Hanford, Stoke-on-Trent. The Authority intends to procure a new ERF with a capacity of 230,000-290,000 tonnes per annum on an 80% Council / 20% private sector ownership basis. The procurement encompasses Design and Build (D&B) and a 25-year Operations and Maintenance (O&M) contract. The Authority will submit a planning application in due course for the future Facility. Key requirements: • Design and build of a new ERF with moving grate combustion technology (or equivalent) and advanced flue-gas treatment systems • Integration of Combined Heat and Power (CHP) technology to deliver low-carbon heat to the city's District Heat Network to supply Local Sector anchor loads. • Heat to be delivered to the ERF site boundary for onward distribution by the Heat Network Provider • The facility must be Carbon Capture Ready and aligned with the Authority's Net Zero 2050 strategy • Full 25-year operations and maintenance service post-commissioning, including planned and reactive maintenance, lifecycle asset replacement, environmental monitoring and community education services |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Education |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
