Storm Drain Master Plan
Sector: Power Transmission • Location: California, United States of America
Source: California Purchasing Group
SCOPE OF WORK The objective of the Master Plan is to develop a realistic and defensible stormwater master plan which outlines and prioritizes maintenance and capital needs , as well as proposing long - term sustainable funding mechanisms for the storm drainage system . The Master Plan should provide a roadmap
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT)
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Storm Drain Master Plan
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK The objective of the Master Plan is to develop a realistic and defensible stormwater master plan which outlines and prioritizes maintenance and capital needs , as well as proposing long - term sustainable funding mechanisms for the storm drainage system . The Master Plan should provide a roadmap for the City to manage and improve its infrastructure to provide flood protection for the City , its businesses , and its property owners . The findings from the Master Plan should provide the basis for recommendations with respect to the City ' s flood management policy , land use planning , new development design standards , and coordination with other City infrastructure management initiatives . The main scope elements of this Master Plan include , but are not limited to , the following : • Identify gaps in utility information and perform targeted surveys to fill data gaps • Review and incorporate latest available topographic data from County , USGS , and FEMA sources • Criteria for establishing infrastructure deficiencies and capacity needs • Updated hydrologic and hydraulic modeling for 30 - year design storm event • Sea level rise impact analysis aligned with San Mateo County planning • Prioritized flood control and infrastructure improvement recommendations • Pump station capacity and condition evaluation • Update to existing culvert analysis for prioritization • Green infrastructure opportunities and MS4 compliance strategies • Creek / channel maintenance recommendations • Cost estimates for recommended improvements with escalation factors • Grant funding analysis and strategies for competitive applications The following task descriptions are presented to assist consultants in preparing proposals . A more detailed scope of services will be incorporated into the negotiated consultant agreement . If any information is unclear , please provide assumptions and state these assumptions within your proposal . The project is divided into the following tasks : A . Project Management The selected Consultant will establish a strategy , budget , and schedule to meet the City ' s goals for the Master Plan and manage the work to deliver the project in a manner acceptable to the City . Key project management responsibilities include : • Hold and lead kick - off meeting in addition to regularly scheduled progress meetings to update the City on important milestones . Consultant to prepare all agendas , meeting minutes , technical memorandums , and reports for all meetings . Consultant will need to determine the number of meetings deemed necessary for successful completion of the project . • Develop and maintain a master project schedule showing critical path and milestones • Preparation of monthly progress reports and invoices • Present to City staff , commissions , and City Council as needed • Coordinate the project team , including staff and subconsultant firms , and manage all work • Monitor all project activities and implement quality assurance and quality control protocols • Assemble and maintain project files within SharePoint that include all documentation and data resulting from the Consultant ' s services , including technical memorandums , engineering computations , documented assumptions , drawings , meeting minutes , correspondence , digital images , and GIS data B . Review and Evaluate Existing Data The Consultant shall review available information related to the City ' s drainage facilities and identify any data gaps and inconsistencies in the City ' s geodatabase . Consultant shall prepare a report summarizing the documents reviewed and any data gaps and / or inconsistencies . List of documents available for review includes , but is not limited to : • Operating and maintenance records • 2010 - 2011 City of Burlingame Storm Drain Capital Improvement Program ( Erler & Kalinowski , Inc .) • 2010 City of Burlingame Neighborhood Storm Drain Improvements Project ( Kennedy / Jenks Consultants ) |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Power Generation (CCGT) |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Transmission tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- Utility Management System and Services UMSS
- FY2023 Patch Truck
- Desert Willow Perimeter Landscape and Lighting Rehabilitation Phase 2 Project