Stormwater Improvement Project - Lindsay Ln & Florisota Dr
Closed · Missouri · Last reported Mar 2026
Source: Missouri Purchasing Group
The Contractor shall remove vegetation , improvements , or obstructions which interfere with project scope as outlined in plan specifications . All debris associated with this removal will be hauled away at the Contractor ’ s expense and disposed of lawfully . The Contractor shall be responsible for coordinating all
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT)
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Stormwater Improvement Project - Lindsay Ln & Florisota Dr
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall remove vegetation , improvements , or obstructions which interfere with project scope as outlined in plan specifications . All debris associated with this removal will be hauled away at the Contractor ’ s expense and disposed of lawfully . The Contractor shall be responsible for coordinating all Utility Relocation . The Contractor shall ensure safe traffic conditions , and must implement a comprehensive Traffic Management Plan ( TMP ) that includes proper planning , worker and public safety measures , and communication . This involves creating a detailed TMP before work begins , utilizing clear signage and flaggers , and coordinating with local authorities . This plan must be submitted at the time of Excavation Permitting . The Contractor shall keep the project area and public rights - of - way reasonably clear at all times and on completion of the work , the Contractor shall remove all equipment and materials brought onto the project area by the Contractor and used in the performance of the contract and shall leave the entire project area in a totally cleared , neat and level condition . Trash burning on the project area is prohibited and none of the materials required to be removed from the project area under this contract shall be buried on the project area or deposited or placed at any place other than a sanitary landfill . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Transmission tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- Utility Management System and Services UMSS
- FY2023 Patch Truck
- Desert Willow Perimeter Landscape and Lighting Rehabilitation Phase 2 Project
