Street Maintenance
One of 9,439 tenders Taiyo tracks in Wisconsin.
Source: Wisconsin Purchasing Group
DESCRIPTION OF WORK This project consists of the construction of a polymer modified asphalt surface . These specifications are for Mathy Construction Co . Black Knight Paving Armor . Other specifications will be considered if presented with a bid . See below . The Asphalt Overlay shall be Wisconsin DOT E - 1 spe
- Status
- Closed
- Sector
- Natural Gas, Waste Processing and Treatment, Water Supply and Storage, Car parking, Automotive, Power Transmission, Power Generation (CCGT), Road
- Location
- Wisconsin, United States of America
- Updated
- 3 Nov 2026
- Source
- Wisconsin Purchasing Group
ConstructChat
Ask ConstructChat about Street Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION OF WORK This project consists of the construction of a polymer modified asphalt surface . These specifications are for Mathy Construction Co . Black Knight Paving Armor . Other specifications will be considered if presented with a bid . See below . The Asphalt Overlay shall be Wisconsin DOT E - 1 specification with Bond / Tack Coat of Emulsified Asphalt Type SS - 1h or equivalent . MATERIALS A . Bond Coat : Emulsified asphalt Type SS - 1h or equivalent . B . Bituminous Mixture Criteria : 1 . Air voids 3 – 5 % 2 . VMA ( Min ) 16 % 3 . Fines / Binder ( Max ) 1 . 2 % 4 . Asphalt : PG 58 - 28 S , Warm Mix is acceptable 5 . Ndsn 100 C . Aggregate Gradation & Properties : The combined gradation of the aggregate and mineral filler shall be within the following limits : Sieve Size Total Passing (% by Weight ) 12 . 5 mm 100 9 . 5 mm 99 – 100 4 . 75 mm 70 - 90 2 . 36 mm 45 - 68 600 µm 21 - 45 75 µm 4 – 10 Properties Percent Crush ( min ) 50 % L . A . Abrasion loss ( max ) 45 % The sum of shale , siltstone , structurally weak and clay ironstone particles shall not exceed 1 . 0 %. CONSTRUCTION 1 . Bond Coat : The bond coat material shall be applied to completely cover the prepared surface . Care shall be taken to apply bond coat on all vertical surfaces of the existing bituminous mats , curbing , gutter , manholes and other structures . Contractor shall place at a rate in accordance with Wisconsin Department of Transportation specifications , generally 0 . 05 to 0 . 07 gallons per square yard . 2 . Contractor shall place temporary No Parking signs on streets to be repaired no later than 24 hours prior to application after coordination with the Police Department . Contractor shall remove signs after repairs are open to traffic . 3 . For clarification of the responsibilities , the contractor shall place signs , barricades and / or personnel in accordance with the MUTCD to ensure traffic does not interfere with the process or damage the surface before it is properly compacted . 4 . Contractor is responsible for locating all utility appurtenances , including but not limited to sanitary and storm sewer manholes , water valves , catch basins , and natural gas valves . 5 . Contractor to perform work under traffic . 6 . Contractor to mill an appropriate joint at the ends of the pavement to be overlaid . This is to create a full depth joint instead of a feathering of material at the ends . 7 . The Recommended Street List may be modified or reduced based on budget . The list is in priority order and will have streets removed from the bottom should the budget be insufficient to do all streets . EQUIPMENT All equipment , tools and machines will be subject to the approval of the Director of Public Works . The contractor shall provide all equipment to clean the pavement prior to work . |
Location
Country | United States of America (USA) |
State | Wisconsin |
Source
Source | Wisconsin Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Natural Gas, Waste Processing and Treatment, Water Supply and Storage, Car parking, Automotive, Power Transmission, Power Generation (CCGT), Road |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Natural Gas tenders in United States of America
- Natural Gas Piping Modifications
- Southeast Treatment Plant (SEP) Biogas Utilization Project
- Plumbing Services Maintenance and Repair at All VTA Facilities
- RNG Plant HVAC Preventative and Emergent Maintenance Services
- NORTHERN RECYCLING FACILITY ELECTRICAL UPGRADES
- Compressed Natural Gas for Vehicle Fuel CNG Fuel
- Southeast Water Pollution Control Plant Biogas Utilization P...
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...