logo

Stringout Construction ( Rehabilitation ) at Ensley Engineer Yard ( EEY ).

Bids closed Apr 2026 · Tennessee · Last reported Jan 2026

Source: Tennessee Purchasing Group

Tender
Closed

Stringout Construction ( Rehabilitation ) at Ensley Engineer Yard ( EEY ) The work consists of furnishing all labor , materials , tools , and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY , and incidental related work . The project is divided into a base project and

Status
Closed
Sector
Forest Products and Packaging, Power Generation (CCGT), Aerospace & Defense, Bridge, Steel, Government, Telecommunications, Water Supply and Storage, Rail, Cement
Location
Tennessee, United States of America
Updated
3 Nov 2026
Source
Tennessee Purchasing Group

ConstructChat

Ask ConstructChat about Stringout Construction ( Rehabilitation ) at Ensley Engineer Yard ( EEY ).

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Stringout Construction ( Rehabilitation ) at Ensley Engineer Yard ( EEY ).” is a tender record in Taiyo, linked to the Forest Products and Packaging sector. It is issued for works, goods, or services related to Tennessee, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Stringout Construction ( Rehabilitation ) at Ensley Engineer Yard ( EEY ) The work consists of furnishing all labor , materials , tools , and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY , and incidental related work . The project is divided into a base project and six ( 6 ) options . The work involves : Removal of the existing steel ramp that extends from the yard to the floating docks ; Demolition and removal of existing ramp abutment ; Removal of existing timber piles , steel pipe piles , and concrete piles ; Demolition and removal of concrete piles and pile caps from existing railroad trestle ; Excavation , dredging and disposal of materials ; Installation of steel floats ( GFE ); Installation of a new landing barge ; Providing new steel pipe piles and steel - framed pile clusters ; Providing donut fenders ; Providing new utilities ( electrical power , lighting , lightning protection , potable water , fire water , telecom , compressed air ); Construction of a new steel connector bridge ; Construction of an electrical substation , including equipment foundation ; Construction of abutment and landside approach to the connector bridge ; All earthwork activities for connector bridge ; and all incidental related work . The base project work shall be completed sequentially from Phase 1 to Phase 2 , to allow continued operation of the Ensley Engineer Yard . Phase 1 shall be completed before the start of Phase 2 . For options when awarded , they they shall be completed in the sequence directed by the Government . Acquisition Strategy : The acquisition will be conducted as an unrestricted procurement with a HUBZone Price Evaluation Preference , using a Best Value Tradeoff source selection process . Magnitude of Construction : Between $ 25 , 000 , 000 and $ 100 , 000 , 000 .

Location

Country

United States of America (USA)

State

Tennessee

Source

Source

Tennessee Purchasing Group

URL

More Details

Record type

Tender

Sector

Forest Products and Packaging, Power Generation (CCGT), Aerospace & Defense, Bridge, Steel, Government, Telecommunications, Water Supply and Storage, Rail, Cement

Article published date

2026-05-15

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender