Stringout Construction (Rehabilitation) At Ensley Engineer Yard (Eey).
Sector: Water Supply and Storage • Location: 2915 Riverport Rd, Memphis TN 38109
Source: SAM.gov
Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY) The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options. The work involves: Removal of the existing steel ramp that extends from the y
- Status
- Closed
- Sector
- Water Supply and Storage, Aerospace & Defense, Steel, Cement, Forest Products and Packaging, Rail, Bridge, Government, Commercial, Power Generation (CCGT), Telecommunications, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Stringout Construction (Rehabilitation) At Ensley Engineer Yard (Eey).
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY) The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options. The work involves: Removal of the existing steel ramp that extends from the yard to the floating docks; Demolition and removal of existing ramp abutment; Removal of existing timber piles, steel pipe piles, and concrete piles; Demolition and removal of concrete piles and pile caps from existing railroad trestle; Excavation, dredging and disposal of materials; Installation of steel floats (GFE); Installation of a new landing barge; Providing new steel pipe piles and steel-framed pile clusters; Providing donut fenders; Providing new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air); Construction of a new steel connector bridge; Construction of an electrical substation, including equipment foundation; Construction of abutment and landside approach to the connector bridge; All earthwork activities for connector bridge; and all incidental related work. The base project work shall be completed sequentially from Phase 1 to Phase 2, to allow continued operation of the Ensley Engineer Yard. Phase 1 shall be completed before the start of Phase 2.For options when awarded, they they shall be completed in the sequence directed by the Government. Acquisition Strategy: The acquisition will be conducted as an unrestricted procurement with a HUBZone Price Evaluation Preference, using a Best Value Tradeoff source selection process. Magnitude of Construction: Between $25,000,000 and $100,000,000. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Aerospace & Defense, Steel, Cement, Forest Products and Packaging, Rail, Bridge, Government, Commercial, Power Generation (CCGT), Telecommunications, Residential |
Article published date | 2026-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in 2915 Riverport Rd, Memphis TN 38109
- Stringout Construction (Rehabilitation) At Ensley Engineer Yard (Eey).
- Stringout Construction (Rehabilitation) At Ensley Engineer Yard (Eey).
- Stringout Construction (Rehabilitation) At Ensley Engineer Yard (Eey).
- Stringout Construction (Rehabilitation) At Ensley Engineer Yard (Eey).
- Stringout Construction (Rehabilitation) At Ensley Engineer Yard (Eey).
