SCOPE OF WORK The contractor will be responsible for all work as described in the “ Scope of Work ”, “ Project Documents ”, “ Specifications ” and “ Drawings ”. It is the responsibility of the Contractor to bid a complete and operable solution . If the bidder feels that the system described is not complete , the

Status
Closed
Sector
Broadband, Telecommunications, Power Generation (CCGT)
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about STRUCTURED CABLING

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “STRUCTURED CABLING” is a tender record in Taiyo, linked to the Broadband sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

SCOPE OF WORK The contractor will be responsible for all work as described in the “ Scope of Work ”, “ Project Documents ”, “ Specifications ” and “ Drawings ”. It is the responsibility of the Contractor to bid a complete and operable solution . If the bidder feels that the system described is not complete , the Bidder will must address their specific concerns in writing to the Owner before submitting a quote . The Owner will not be responsible for additional costs incurred by the bidder due to the submission of an incomplete bid . GENERAL REQUIREMENTS The contractor will be required to provide an applicable State License for the scope of work described herein . The contractor ' s quote shall include a warranty for all work to be performed for no less than 12 months from the date of completion . Clean up work will be performed daily and will be required in one area before moving to another area to perform work . The installation schedule pertaining to this bid package must be adhered to by the contractor or liquidated damage will be assessed by the Owner in the amount listed in the agreement . No extension of time will be granted unless written consent from the owner is given . Buildings will be available to the contractor during regular business hours for investigation and prep work . The contractor ' s bid will include installation , cutover , and testing of equipment after 4 : 00pm and before 7 : 00am of the next business day . Site access hours may vary due to normal school hours , holidays , summer break . The contractor shall assume that normal construction hours will be after 4 : 00pm and before 7 : 00am on the next business day . STRUCTURED CABLE The Santa Barabara Unified School District ( the Owner ) requires new backbone cabling to be installed throughout their campus . This includes , but is not limited to , removal of existing backbone cabling , installation of new 12 - strand single - mode fiber optic cabling , patching patch panel to network switch connectivity and patching cable outlets to end devices connectivity . All installed fiber optic strands will undergo dual - wavelength bi - directional power meter testing to confirm performance and compliance with industry standards . Test results will be documented and submitted to the Owner for review . Backbone Cabling - All new 12 - strand single - mode fiber shall be installed from the existing MDF to each of the IDF ’ s shown on the provided drawings . All new fiber backbone cabling systems shall include new termination hardware installed per specifications . The contractor will supply and install necessary pathways , conduit , raceway , innerduct , j - hooks and connectors . All fiber must be incased in conduit or innerduct from buildings point of entry to MDF / IDF location . All management ties used on cabling between patch panels and switches must be reusable Velcro based cable ties . Removal of all unused cabling and connectivity devices . The contractor will schedule all demo with district after cutting over is complete . Contractors can find all backbone cabling material part numbers in the provided specification within the RFP . General Notes : • The contractor shall field verify all site conditions and all pathways prior to start of work . • Contractors are to include in their proposal all pathway core hole penetrations through interior walls and exteriorwalls . • Contractors will include in their proposal all equipment rentals , all tools , all ladders , permits and temporary fence rental needed to complete this project . • Contractor to field verify all LB type conduit fittings . All fittings 1 . 5 " and larger that will meet the cables bend radius is acceptable to pull fiber . Any LB type conduit fittings smaller than 1 . 5 " will need to be reviewed with the district to have replaced if necessary . INCLUDED IN THE CONTRACTOR ' S SCOPE The following Items are included in the Contractor ' s Scope of Work for this Project : 1 . Contractor to provide and install new twelve ( 12 ) strand single - mode fiber installed from existing MDF to each IDF location shown on drawings , refer to specifications for more information . 2 . Contractor to provide and install two ( 2 ) new single - mode fiber patch cables for each fiber installed , refer to specifications for more information . 3 . Contractor to provide and install two ( 2 ) new single - mode SFP connectors for each fiber cable installed . ( HPE Aruba 10G SFP + LC LR Part # J9151E ) 4 . Contractor to provide and install all necessary site conduit and pathway systems including : conduit , seal - tight , stubs , pull boxes , termination boxes , J - hooks , wire hangers , surface mount raceway , and surface mount boxes required for the new cable . 5 . Contractor to provide testing , labeling , and warranties as specified in the construction documents .

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Broadband, Telecommunications, Power Generation (CCGT)

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender