logo

Studying and Assessing the Benthic Response to Electrical Stimuli (SABRES)

Complete · United Kingdom

Source: Find a Tender Service (UK)

Tender
Complete

High voltage submarine cables produce electromagnetic fields (EMF) external to the cable due to current flowing within their metallic components, primarily the main conductor. While the magnitude of these fields decays rapidly with separation from the cables, reducing to background levels within 10's of meters, cable circuits extend continuously across the seabed for 100's of km. Accurately quanti

Status
Closed
Sector
Power Transmission, Power Generation (CCGT)
Location
United Kingdom
Updated
3 Nov 2026
Source
Find a Tender Service (UK)

ConstructChat

Ask ConstructChat about Studying and Assessing the Benthic Response to Electrical Stimuli (SABRES)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Studying and Assessing the Benthic Response to Electrical Stimuli (SABRES)” is a tender record in Taiyo, linked to the Power Transmission sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

High voltage submarine cables produce electromagnetic fields (EMF) external to the cable due to current flowing within their metallic components, primarily the main conductor. While the magnitude of these fields decays rapidly with separation from the cables, reducing to background levels within 10's of meters, cable circuits extend continuously across the seabed for 100's of km. Accurately quantifying and understanding the impact of anthropogenic EMF on seafloor organisms is therefore vital. Given the significant volume of new interconnector systems being installed/planned (e.g. For the Eastern Green Link projects (1-4) represent ~1800km of cable circuit), it is important to ensure that this transition to net zero does not result in ecological harm.

Location

Country

United Kingdom (UK)

Source

Source

Find a Tender Service (UK)

URL

More Details

Record type

Tender

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2026-10-07

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender