Subsea Inspection
Contract award notice · European Union · Last reported Apr 2026
Source: TED Europa
Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea
Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). All inspections shall be performed in accordance with the appli
- Status
- Closed
- Sector
- Wind, Manufacturing (Industrial), Oil and Gas, Warehouse, Power Generation (CCGT), Raw Materials, Automotive
- Location
- Unknown (Europe)
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Subsea Inspection
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract award notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). All inspections shall be performed in accordance with the applicable standards of the Bundesamt für Seeschifffahrt und Hydrographie (BSH) and the respective wind farm-specific inspection plans. In B1, all 21 WTGs and the OSS shall be inspected every four years. The next scheduled campaign is planned for 2027. In B2, 20 WTGs shall be inspected annually (25% scope), with both jacket and monopile foundations to be covered. The OSS in B2 is subject to a four-year inspection cycle. The inspections may involve either full visual and functional checks or reduced general visual inspections (GVI). Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as remotely operated vehicles (ROV). All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs. Lot 2: Periodic Subsea Inspections - Offshore Wind Farms in the North Sea Lot 2 covers the periodic subsea inspections for the offshore wind farms Hohe See (HS), Albatros (ALB), and He Dreiht (HD). The scope includes visual and functional inspections of underwater support structures of WTGs and OSSs. All inspections shall be performed in accordance with the applicable standards of the BSH and the respective wind farm-specific inspection plans. In HS and ALB, 21 to 22 WTGs shall be inspected annually (25% scope). The OSS in each wind farm is subject to a four-year inspection cycle. In HD, which is currently under construction, 16 WTGs shall be inspected annually (25% scope). The inspection scope is based on applicable standards and is expected to be updated as the project progresses. The inspections may involve either full visual and functional checks or reduced GVI. Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as ROVs. All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs. |
Original sector | Supporting and auxiliary transport services; travel agencies services, Architectural, construction, engineering and inspection services, Services related to the oil and gas industry, Business services: law, marketing, consulting, recruitment, printing and security |
Location
Country | Unknown (Europe) |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Wind, Manufacturing (Industrial), Oil and Gas, Warehouse, Power Generation (CCGT), Raw Materials, Automotive |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Wind tenders in European Union
- Supplementary information regarding use of Achilles Utilities Nordics & Central Europe qualification system by Ørsted and Ørsted Group including the entities mentioned in section 1 and 2.1.4 General information
- Contrato de Sobreequipamento do Parque Eólico do Loiral III e Reequipamento do Parque Eólico do Paul
- Contrato de Sobreequipamento do Parque Eólico do Loiral III e Reequipamento do Parque Eólico do Paul
- Outer Dowsing
- Assessment of strategic stakeholder needs, environmental conflicts, and acceleration potentials in energy network planning and implementation to safeguard the Wadden Sea World Heritage Site
- Supplementary information regarding use of Achilles Utilities Nordics & Central Europe qualification system by Ørsted and Ørsted Group including the entities mentioned in section 1 and 2.1.4 General information
- Fourniture de gaz médicaux pour les établissements adhérant au GCS Achats du Centre des départements : Indre et Loire 37 et Loiret 45
- Magnet Joint Qualification System (Magnet JQS) - Notification of qualification system
