Suministro e instalacion de una bomba de calor y dos enfriadoras de agua
Sector: Water Supply and Storage • Location: Spain
Source: TED Europa
Suministro e instalacion de una bomba de calor en el CS Playa Blanca, y dos enfriadoras de agua, una en el CS Tias y otra en el CSTiterroy, pertenecientes a la Gerencia de Servicios Sanitarios del Area de Salud de Lanzarote
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Spain
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Suministro e instalacion de una bomba de calor y dos enfriadoras de agua
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Suministro e instalacion de una bomba de calor en el CS Playa Blanca, y dos enfriadoras de agua, una en el CS Tias y otra en el CSTiterroy, pertenecientes a la Gerencia de Servicios Sanitarios del Area de Salud de Lanzarote |
Original sector | Electrical machinery, apparatus, equipment and consumables; lighting |
Location
Country | Spain |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-08-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Spain
- Obra de mejora del sistema de saneamiento de Burela. Nueva estación depuradora de aguas residuales de Burela. Burela (Lugo). Actuación cofinanciada por la Unión Europea con el Fondo Europeo de Desarrollo Regional (FEDER) en un 60% del gasto elegible en el marco del Programa Galicia Feder 2021-2027/ Improvement work on the sanitation system of Burela. New wastewater treatment plant in Burela. Burela (Lugo). Action co-financed by the European Union with the European Regional Development Fund (ERDF) at 60% of the eligible expenditure within the framework of the Galicia ERDF Programme 2021-2027
- Add Non-Potable Water Dist Lines To Irrigation Areas, Multi
- Add Non-Potable Water Distribution Lines To Irrigation Areas, Multi
- Cns Finished Water Tank
- Add Non-Potable Water Distribution Lines To Irrigation Areas, Multi
- Rpr Sewer & Power Plant Genset & Ats, Multi
- Add Non-Potable Water Distribution Lines To Irrigation Areas, Multi
- Add Non-Potable Water Distribution Lines To Irrigation Areas, Multi
