logo

Summer Oaks Boat Landing Pier

The scope, dates and status of this tender. A free account opens every field.

Source: Wisconsin Purchasing Group

Tender
Closed

Specifications are listed below . • New • Hewitt Roll - A - Dock with galvanized steel frame pier o Minimum of thirty - two ( 32 ) feet long by 6 ( six ) feet wide ( not including approach ramp ) • Galvanized deep water kit • Approach ramp o Four ( 4 ) feet long by six ( 6 ) wide o Constructed of same materials as

Status
Closed
Sector
Metal, Steel, Water Supply and Storage, Rail, Commercial, Cement
Location
Wisconsin, United States of America
Updated
3 Nov 2026
Source
Wisconsin Purchasing Group

ConstructChat

Ask ConstructChat about Summer Oaks Boat Landing Pier

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Summer Oaks Boat Landing Pier” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Wisconsin, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Specifications are listed below . • New • Hewitt Roll - A - Dock with galvanized steel frame pier o Minimum of thirty - two ( 32 ) feet long by 6 ( six ) feet wide ( not including approach ramp ) • Galvanized deep water kit • Approach ramp o Four ( 4 ) feet long by six ( 6 ) wide o Constructed of same materials as pier • Galvanized steel or stainless - steel transition plate o Six ( 6 ) feet wide by two ( 2 ) feet or longer • White aluminum decking • Six ( 6 ) 2 - 1 / 2 ” galvanized support legs o 2 at ramp joint , 2 at dock section joint and 2 at the water end • Six ( 6 ) galvanized post sleeves o 2 at ramp joint , 2 at dock section joint and 2 at the water end • Three ( 3 ) mud pads o 3 posts should land on concrete eliminating the need for mud pads • Six ( 6 ) white pipe caps • Hewitt rub rail along both sides of dock and water end • Four ( 4 ) post torpedo white bumpers • Four ( 4 ) 12 - inch commercial grade mooring / dock cleats • One ( 1 ) post ratchet • Assembly , delivery and first installation of said pier

Location

Country

United States of America (USA)

State

Wisconsin

Source

Source

Wisconsin Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Steel, Water Supply and Storage, Rail, Commercial, Cement

Article published date

2026-05-06

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender