logo

Sunrise Lake Culvert Modification and Stormwater Control Project , Middleton , NH

One of 2,790 tenders Taiyo tracks in New Hampshire.

Source: New Hampshire Purchasing Group

Tender
Closed

Task 1 . Site Preparation and Mobilization Construction sequencing and site preparation shall occur according to plans titled , “ CULVERT MODIFICATIONS PLAN & PROFILE ” and “ LAKELAND ASSOCIATION BEACH ,” prepared by Underwood Engineers ( 2025 ), as well as project - specific conditions identified in the approved permits from

Status
Closed
Location
New Hampshire, United States of America
Updated
3 Nov 2026
Source
New Hampshire Purchasing Group

ConstructChat

Ask ConstructChat about Sunrise Lake Culvert Modification and Stormwater Control Project , Middleton , NH

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Sunrise Lake Culvert Modification and Stormwater Control Project , Middleton , NH” is a tender record in Taiyo. It is issued for works, goods, or services related to New Hampshire, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Task 1 . Site Preparation and Mobilization Construction sequencing and site preparation shall occur according to plans titled , “ CULVERT MODIFICATIONS PLAN & PROFILE ” and “ LAKELAND ASSOCIATION BEACH ,” prepared by Underwood Engineers ( 2025 ), as well as project - specific conditions identified in the approved permits from NHDES . NOTE : SRPC , in conjunction with project partners , will be responsible for obtaining and staging all construction materials , as well as coordinating with landowners as referenced in Section VIII ( 10c ). Task 2 . Culvert Modification The culvert modifications shown on the Plan titled , “ CULVERT MODIFICATIONS PLAN & PROFILE ” ( Underwood Engineers , 2025 ), include a culvert improvement at an unnamed perennial Tier 1 stream crossing that runs across Lake Shore Drive and has an outfall that leads into Sunrise Lake . Approximately 64 linear feet of the existing 24 " CMP culvert will be removed , with only 16 linear feet being replaced . The remaining 48 linear feet will be daylighted in a natural channel with native plantings to simulate a natural stream . This project seeks to reduce chronic erosion and phosphorus transport to the lake , infiltrate stormwater , and reduce runoff volume . Task 3 . Stormwater Control Measures – Rain Garden ( RG # 1 ) and Swale The stormwater control measures on the Plan titled , “ LAKELAND ASSOCIATION BEACH ” ( Underwood Engineers , 2025 ), include the construction of three rain gardens designed to treat stormwater runoff and reduce phosphorus loading to Sunrise Lake . Rain Garden # 1 ( RG # 1 ) and the subsequent 4 - foot - wide riprap swale is the minimum construction requirement for the proposed stormwater control measure associated with this request for bids . It is designed to be oval - shaped ( 31 ' x 21 ') with 2 : 1 slopes ...

Location

Country

United States of America (USA)

State

New Hampshire

Source

Source

New Hampshire Purchasing Group

URL

More Details

Record type

Tender

Article published date

2026-04-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender