Sunrise Lake Culvert Modification and Stormwater Control Project , Middleton , NH
One of 2,790 tenders Taiyo tracks in New Hampshire.
Source: New Hampshire Purchasing Group
Task 1 . Site Preparation and Mobilization Construction sequencing and site preparation shall occur according to plans titled , “ CULVERT MODIFICATIONS PLAN & PROFILE ” and “ LAKELAND ASSOCIATION BEACH ,” prepared by Underwood Engineers ( 2025 ), as well as project - specific conditions identified in the approved permits from
- Status
- Closed
- Location
- New Hampshire, United States of America
- Updated
- 3 Nov 2026
- Source
- New Hampshire Purchasing Group
ConstructChat
Ask ConstructChat about Sunrise Lake Culvert Modification and Stormwater Control Project , Middleton , NH
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Task 1 . Site Preparation and Mobilization Construction sequencing and site preparation shall occur according to plans titled , “ CULVERT MODIFICATIONS PLAN & PROFILE ” and “ LAKELAND ASSOCIATION BEACH ,” prepared by Underwood Engineers ( 2025 ), as well as project - specific conditions identified in the approved permits from NHDES . NOTE : SRPC , in conjunction with project partners , will be responsible for obtaining and staging all construction materials , as well as coordinating with landowners as referenced in Section VIII ( 10c ). Task 2 . Culvert Modification The culvert modifications shown on the Plan titled , “ CULVERT MODIFICATIONS PLAN & PROFILE ” ( Underwood Engineers , 2025 ), include a culvert improvement at an unnamed perennial Tier 1 stream crossing that runs across Lake Shore Drive and has an outfall that leads into Sunrise Lake . Approximately 64 linear feet of the existing 24 " CMP culvert will be removed , with only 16 linear feet being replaced . The remaining 48 linear feet will be daylighted in a natural channel with native plantings to simulate a natural stream . This project seeks to reduce chronic erosion and phosphorus transport to the lake , infiltrate stormwater , and reduce runoff volume . Task 3 . Stormwater Control Measures – Rain Garden ( RG # 1 ) and Swale The stormwater control measures on the Plan titled , “ LAKELAND ASSOCIATION BEACH ” ( Underwood Engineers , 2025 ), include the construction of three rain gardens designed to treat stormwater runoff and reduce phosphorus loading to Sunrise Lake . Rain Garden # 1 ( RG # 1 ) and the subsequent 4 - foot - wide riprap swale is the minimum construction requirement for the proposed stormwater control measure associated with this request for bids . It is designed to be oval - shaped ( 31 ' x 21 ') with 2 : 1 slopes ... |
Location
Country | United States of America (USA) |
State | New Hampshire |
Source
Source | New Hampshire Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Veteran Transportation
- Countywide Vending Machine Services with Healthy Options
- Temporary Staffing Services Local and National
- NEW TIRES RETREADS AND TIRE SERVICES
- Youth Suicide Prevention Programming
