Supercomputer System 1 Set
Sector: Power Generation (CCGT) • Location: Japan
Source: Japan External Trade Organization (JETRO)
Classification of the products to be procured : 1 Nature and quantity of the products to be rent : Supercomputer System Set Type of the procurement : Rent Basi requirements of the procurement : A The target Supercomputer System must be composed of the following seven servers, two network disk systems, a backu storage system for disaster recovery, network devices, uninterruptible power supply syst
- Status
- Prospective
- Sector
- Power Generation (CCGT), Residential, Education, Commercial
- Location
- Japan
- Updated
- 3 Nov 2026
- Source
- Japan External Trade Organization (JETRO)
ConstructChat
Ask ConstructChat about Supercomputer System 1 Set
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | prospective |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Classification of the products to be procured : 1 Nature and quantity of the products to be rent : Supercomputer System Set Type of the procurement : Rent Basi requirements of the procurement : A The target Supercomputer System must be composed of the following seven servers, two network disk systems, a backu storage system for disaster recovery, network devices, uninterruptible power supply systems, and cooling devices. The seven servers are : a GenomeNet computation server, a computational chemistry server, a login server, a GenomeNet publi server, a GenomeNet development server, an infrastructure server, and a system administration server. The target system must be operated in the Linux environment. B GenomeNet computation server consists of System A with two or more nodes and System B with 8 or more nodes. Minimum requirements for a System A node : theoretical computing perfor mance of 57.1TFLOP or greater ; 24TiB or more main memory ; 50TB or more SSD (NVM Express). Minimum requirements for a System B node : theoretical computing performance of 4.7TFLOP or greater ; 5 or more CPU cores ; 512GiB or more main memory for at least 5 nodes, and 1TiB or more main memory for at least 3 nodes. Both systems require software for computational biology, especially for genome analysis. C Computational chemistry server consists of System A with 6 or more nodes, and System B with 1 or more nodes. Minimum requirements for a System A node : theoretical computing perfor mance of 4.7TFLOP or greater ; 5 or more CPU cores ; 512GiB or more main memory. Minimum requirements for a System B node : theoretical computing performance of 5.7TFLOP or greater ; 6 or more CPU cores ; 1024GiB or more main memory ; or more GPUs, equivalent to or higher than NVIDIA B20 (180GB memory) and supporting Cuda libraries. All nodes require software for computational chemistry. D GenomeNet publi server. Minimum requirements : 1 or more nodes, each of which includes 12 or more CPU cores and 768GiB or more main memory. E GenomeNet development server. Minimum requirements : four or more nodes, each of which includes 12 or more CPU cores and 1.5TiB or more main memory. F Infrastructure server consists of 1 or more nodes. ⒜ Development server : Minimum requirements for three or more nodes : each node possesses 6 or more CPU cores ; 1.0TiB or more main memory. ⒝ Database server : Minimum requirements for two or more nodes : each node possesses 1 or more CPU cores (each core with a clock rate of 3.6GHz or faster) ; 256GiB or more main memory ; a relational database system. ⒞ Virtual machine server : Minimum requirements for two or more nodes : each node possesses 3 or more CPU cores ; 512GiB or more main memory. ⒟ Operation management server A : Minimum requirements for three or more nodes : each node possesses 3 or more CPU cores ; 256GiB or more main memory. ⒠ Operation management server B : Minimum requirements for six or more nodes : each node possesses 3 or more CPU cores ; 512GiB or more main memory. G Login server consists of or more nodes. Minimum requirements for a node : theoretical computing perfor mance of 3.10TFLOP or greater ; 512GiB or more main memory ; or more GPUs, equivalent to the GPU on Computational chemistry server System B and supporting Cuda libraries. H System administration server consists of or more nodes, each of which possesses 3 or more CPU cores and 128GiB or more main memory. I Network disk system. Minimum requirements : 2.1PB or more of physical capacity, and 1.2PB or more (effective capacity) of network file system ; 27PB or more of physical capacity, and 20PB or more (effective capacity) of distributed file system. J Disaster recovery backu storage system must be 1.2PB or more (effective capacity). K The following servers must be connected with high-speed networks of at least 10Gbps for server connection : GenomeNet computation server System A, Login server, GenomeNet publi server, GenomeNet development server, Infrastructure server, and System administration server. The network for this server connection must be connected with KUIN and SINET through Firewall. A VPN facility must be provided for the access from and to outside of the system. L The following servers must be connected with high-speed networks of at least 10Gbps to constitute a NA system : GenomeNet computation server, Computational chemistry server, Login server, GenomeNet publi server, GenomeNet development server, Infrastructure server, System administration server and the network file system. M The following servers must be connected with high-speed networks of at least 800Gbps : GenomeNet computation server, Computational chemistry server, Login server, GenomeNet publi server, GenomeNet development server, Infrastructure server (except Operation management server B), System administration server and the distributed file system. N The seven servers, two disk systems and network systems must be connected to UP that can supply electricity for five minutes continuous operation upon the electri power failure. O The disaster recovery backu storage system must be connected to UP that can supply electricity for five minutes continuous operation upon the electri power failure. P Cooling system must be effective enough to support a stable operation of the entire system. Take measures to reduce power consumption. Q 1 Windows lapto PCs for courses. Time limit for the submission of the requested material : 1 : 0 May, 202 Contact point for the notice : Hisashi Uchida, Procurement And Accounting Section, Accounting Division, Administration Bureau of Uji Campus, Kyoto University, Gokasho, Uji-shi, 611-001 Japan TEL 0774-38-337 email address : uji.sisan@mail2.adm.kyoto-u.ac.jp |
Location
Country | Japan |
Source
Source | Japan External Trade Organization (JETRO) |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Residential, Education, Commercial |
Article published date | 2026-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in Japan
- Ms Power Platform Mastering And Advanced Training (In Japanese & English) For Srf-Jrmc, Japan
- Swage Kit Assembly
- Modify Valve Test Stand X31I For Srf-Jrmc Yokosuka
- Commercial Power For The Life Support Area At Kyogamisaki Communication Site In Kyoto, Japan
- Fy27 Improve Family Housing Yokota Ab Paip 10 Phase 1 (32 Un)
- Telecommunications equipment
- Operation And Maintenance (O&M) Of Defense Information Systems Network (Disn) Power Plants And Station Battery Systems
- Control System Upgrades And Replacement Work On Tadano Infrastructure Solutions Co., Ltd. Land Portal Cranes, Lc47 And Lc48 At Berth 12 In The Commander Fleet Activities Yokosuka (Cfay), Japan
