Supply Solid waste Steel Containers 4.0 m3 & 1.0 m3
The scope, dates and status of this tender. A free account opens every field.
Source: DevelopmentAid
Tender
Closed
Supply Solid waste Steel Containers 4.0 m3 & 1.0 m3
- Status
- Closed
- Sector
- Biomass, Steel, Waste Processing and Treatment
- Location
- West Bank and Gaza
- Updated
- 3 Nov 2026
- Source
- DevelopmentAid
ConstructChat
Ask ConstructChat about Supply Solid waste Steel Containers 4.0 m3 & 1.0 m3
Pick a question to edit it, or write your own.
First answer free · no account
I am a
Tender Information FAQ
Tender Information
3 Q
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Supply Solid waste Steel Containers 4.0 m3 & 1.0 m3 |
Location
Country | West Bank and Gaza |
Source
Source | DevelopmentAid |
URL |
More Details
Record type | Tender |
Sector | Biomass, Steel, Waste Processing and Treatment |
Article published date | 2026-03-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Biomass tenders in Palestine / West Bank & Gaza
- Supply and Installation of Hydroponic and Biogas Digester Units
- Daily collection and transport of solid waste in Gaza (Primary collection) (2 Lots)
- ITB - Transferring the solid waste from Firas Market Dumpsite to Abu Jarad Dump
- Integrated Solid Waste Management Project-Phase I: Supply of Landfill & Transfer Station Equipment
- RFQ Supply & Delivery of Open Solid Waste Steel Containers for the West Bank and for Gaza (TWO LOTS)
- Integrated Solid Waste Management Project-Phase I: Detailed Design for the Rehabilitation of existing cells, Construction of new cells, and Installation of gas collection and leachate collection/treatment systems at (1) Zahrat Al-Finjan and (2) Al-Minya Landfills
- Integrated Solid Waste Management Project-Phase I: Detailed Study on Optimizing Solid Waste Collection across the West Bank
- Supply and Installation of Net Houses (pergolas) and Plastic Greenhouses, Supply and Installation of Fencing and Irrigation Equipment for Grape Cultivation, and Supply and Installation of Hydroponic Systems, Biogas Systems and Their Accessories
