logo
TenderActive

Survey, Design, and Construction Supervision (Resident) Services in Karachi, Pakistan

Sector: Water Supply and Storage • Location: Pakistan

Source: United Nations Global Marketplace (UNGM)

Survey, Design, and Construction Supervision(Resident) Services in Karachi, PakistanWork Station: Karachi, PakistanExpected Start Date: 1 May 20261. Background / Rationale:The United Nations Human Settlements Programme (UN-Habitat) is the United Nations agencymandated by the General Assembly to promote socially and environmentally sustainable towns andcities with the goal of ensuring adequate shel

Status
Closed
Sector
Water Supply and Storage, Forest Products and Packaging, Steel, Education, Government, Bridge, Residential, Road, Commercial, Manufacturing (Industrial), Cement, Automotive
Location
Pakistan
Updated
3 Nov 2026
Source
United Nations Global Marketplace (UNGM)

ConstructChat

Ask ConstructChat about Survey, Design, and Construction Supervision (Resident) Services in Karachi, Pakistan

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Survey, Design, and Construction Supervision (Resident) Services in Karachi, Pakistan” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Pakistan.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Survey, Design, and Construction Supervision(Resident) Services in Karachi, PakistanWork Station: Karachi, PakistanExpected Start Date: 1 May 20261. Background / Rationale:The United Nations Human Settlements Programme (UN-Habitat) is the United Nations agencymandated by the General Assembly to promote socially and environmentally sustainable towns andcities with the goal of ensuring adequate shelter for all. In Pakistan, UN-Habitat works inpartnership with national and provincial governments, development partners, civil societyorganizations, and academic institutions to support inclusive urban development and improvedliving conditions in underserved settlements.UN-Habitat Pakistan is currently implementing a participatory settlement upgrading programme inseveral cities, including Haripur, Kohat, Peshawar, Karachi, and Quetta. In Karachi, the programmetargets 12 underserved settlements where Community Action Planning (CAP) processes are beingconducted to identify priority needs and feasible interventions. The programme combines socialprogramming with targeted infrastructure improvements, including public space upgrades,improved connectivity, and the construction and rehabilitation of small-scale infrastructure. Theseinterventions aim to enhance living conditions by improving access, water supply, sanitation andsewerage services, and other essential community infrastructure.Karachi, Pakistan’s largest metropolitan city, faces complex urban challenges including highpopulation density, heavy traffic volumes, monsoon-driven drainage issues, and coastalenvironmental conditions. Within this framework, the project also includes improvements to smallscaleurban infrastructure to enhance accessibility and safety. The present procurement is coversthe design and construction supervision of two Steel Bridges Near Lassi Goth (10ft wide – 260ftlong for light vehicular bridge) and Hassan Noman, (4ft wide – 230ft long pedestrian bridge)KarachiPage 2 of 92. Objectives of the Assignment:The objective of this assignment is to procure the services of a qualified consulting firm toundertake the engineering design and construction supervision of two bridges in Karachi. Theconsulting firm will conduct the necessary site surveys, soil investigations, hydrologicalassessments, and traffic load analyses required for safe, reliable, and economical bridge design.Based on these investigations, the consultant will prepare complete engineering design packagesincluding detailed drawings, structural calculations, technical specifications, Bills of Quantities(BOQs), and engineer’s cost estimates to support procurement and construction.The firm will also support UN-Habitat in obtaining necessary approvals and No ObjectionCertificates (NOCs) and also provide technical clarifications during the procurement process (ifrequired). The consultant firm will prepare all required engineering calculations and documentationto facilitate third-party design validation or review by the relevant government authorities.During the construction phase, the consulting firm will act and provide Engineering services onbehalf of UN-Habitat, for the works and provide full construction supervision to ensure that theworks are implemented in accordance with the approved designs, technical specifications,environmental and social safeguards, and applicable safety standards.The consultant will establish and implement a comprehensive Quality Assurance and QualityControl (QA/QC) system, including supervision of construction activities, review of contractormethod statements, verification of contractor performance, certification of work progress, andmonitoring compliance with contract specifications and engineering standards. Material testingrequired for quality control will be carried out by the contractor through approved laboratories,while the consultant will review testing procedures and results, watch critical tests where necessary,maintain testing records, and ensure that only quality materials are used in the works.In addition, the consultant firm will provide contract administration services, including the reviewof contractor submissions, review and recommendation of interim payment certificates for UNHabitatapproval, evaluation of variations, and monitoring of construction progress against theapproved schedule. The consultant firm will remain engaged until completion of the bridges andissuance of the Substantial Completion Certificate to the contractor.During the construction stage, UN-Habitat (including third-party monitoring entity) will undertakeroutine monitoring of the works and oversee the certification of payments, management ofvariations. UN-Habitat directly or through Third party monitoring, will be responsible for handoverprocess and will monitor the project during the Defects Liability Period (DLP) and coordinate withthe contractor to ensure that any defects identified during this period are properly addressed. Belowis the bridges information.Bridge-1: Light vehicular Steel bridge 260 ft long X10 ft wide at Lassi Goth-KarachiBridge-2: Pedestrian Steel bridge 230ft long x 4 ft wide at Hassan Noman-Karachi3. Scope of Work:Page 3 of 9The consulting firm will provide all professional services necessary for the soil investigation,design, documentation, and technical support during the construction of two bridges in Karachi.The investigations and studies undertaken for design purposes will be limited to those reasonablyrequired to support a safe, reliable, and economical bridge design, and will be proportionate to thescale and complexity of the works. The assignment includes geotechnical investigations,determination of High Flood Level (HFL), estimation of scour depth, detailed engineering design,preparation of construction documents, and technical supervision during construction. The scopeincludes the below but not limited to;3.1. Site Surveys and Investigations: The consultant firm will undertake all necessary surveysand investigations required for the proper design of the bridges, which include:a. Topographic surveys of the proposed locations for both bridges, including surrounding terrain,approaches, drainage paths, and existing infrastructureb. Carry out geotechnical investigations and soil testing at both bridge locations to determine soilcharacteristics, bearing capacity, groundwater conditions, and other parameters required forfoundation design and prepare report.c. Determine the appropriate design load classification for the bridge based on analysis of currentand projected traffic volumes and composition, covering cars, pedestrians, bicyclists, and othervehicles.d. Collect and review relevant site data, existing infrastructure information, and environmentalconditions.3.2. Concept Design: Prepare concept design options and layout drawings for both bridgesincluding footpaths, service ducts, accessibility elements and finalize the concept in consultationwith UN-Habitat. Explore the possibility of introducing guiding tiles for visually impairedpersons, and the use of Sindh motifs to enhance the visual identity of the bridges.3.3. Structural Design: prepare complete structural designs for the bridges and associatedstructures, ie. Foundation/ sub-structure, super-structures/abutments, deck, railing, approach road,protection work if needed.The firm will submit the design for review and endorsement by a third-party validator or relevantgovernment department, as recommended by UN-Habitat.3.4. Engineering documents: prepare complete construction documentation for bidding andimplementation of the works which include but not limited to,• Detailed structural drawings, construction drawing, reinforcement details, connection details,welding, riveting and bolting requirements and fabrication drawings.• Prepare Bills of Quantities (BOQs) for structural works.• Prepare Engineer’s Cost Estimates.• Technical specifications.• Bidding document.Page 4 of 93.5. Construction Supervision; During the construction phase, the consultant firm will provideEngineer supervisory services on behalf of UN-Habitat to ensure that the works are implementedin accordance with the approved designs, drawings, technical specifications, safety standards, andenvironmental and social safeguard requirements. The consultant will deploy qualified supervisionpersonnel to monitor construction activities, review the contractor’s work plans and methodstatements, verify the quality of materials and workmanship, certify completed works for payment,and ensure compliance with contractual requirements. The consultant will review and approve thecontractor’s shop drawings prior to fabrication and installation. The consultant will advise UNHabitaton any design-related issues or structural concerns arising during construction. The bridgelayout will be set out by the consulting firm’s surveyors and verified by the designer.Considering the scope of work and the proximity of the two bridges, the consultant may managesupervision through a single site office, preferably located at the vehicular bridge site in Lassi Goth.The consultant firm will ensure adequate and timely site presence through qualified supervisionpersonnel during critical construction activities.Note Construction duration for both bridges is expected to be six months, so consulting firm shouldconsider six months for construction supervision wile resource plainingNote on Compliance: The design, analysis, detailing, and construction documentation for thebridges will comply with NHA specifications and internationally recognized engineering standards(AISC, ASTM, ACI). The design will ensure safety, durability, and serviceability under applicableloads and environmental conditions. Particular attention will be given to corrosion protection,including the use of rust-resistant coatings, considering the potential salt exposure in Karachi.Note on Scope: The scope and extent of geotechnical investigations, hydrological studies, andother technical assessments shall be commensurate with the scale of the works and shall be agreedwith UN-Habitat prior to execution to ensure efficiency and cost-effectiveness.Design review and consultation meetings: The firm representative will attend design review andprogress meetings with UN-Habitat during the design development stage of the project. Thesemeetings may also involve other project stakeholders and are expected to be more frequent duringthe early phases of the design stage.Expected Outputs/Deliverables (Single package for two bridges).1. Submission of Inception report2. Submission of topographic maps, brief assessment report on hydrology, soil investigation oftwo location and determination of load class,3. Submission of Detailed Engineering Design Package. (Approval will subject to third partyvalidation)4. Submission of Bidding package.5. Submission of mid-term technical advisory and supervision notes and shop drawings.6. Submission of final technical advisory notes & supervision report, As built drawings.7. Submission Final reportPage 5 of 94. Project duration and workplan:The overall project duration is 12 months, excluding the Defects Liability Period (DLP), andincludes a three-month procurement waiting period.WorkplanActivities Deliverable TimelineContract signing, inception report, kick-off meetings. Inception report 15-May-26Conduct topographic surveys, geotechnicalinvestigations, review of water flow data including trafficload determination for vehicular bridgeAssessmentreport15-Jun-26Preparation of concept design options in consultationwith UN-HabitatConcept DesignPackage30-Jun-26Structural design (with calculation) of both bridges’ DED Package 15-Jul-26Preparation of construction drawings, BOQs, engineer’scost estimates, technical specifications, and biddingdocumentsBidding Package 30-Jul-26Construction supervision for both bridges, includingverification that the works comply with the approveddesigns, drawings, and technical specifications, andcertification of final payment, Shop drawings and Asbuilt drawingTechnicalAdvisory Notes /SupervisionReportsNov 2026-Apr2027Completion report/ As built drawings Final Report 30 June 2027DLP (Outside the scope of consulting firm) NA 30 Oct 2027Page 6 of 95. Payment ScheduleInstallments Deliverable description UponcompletionofDeliverablePayment(%)Duedate1st 1. Submission of Inception report1,2 20%30 Jun20262. Submission of topographic maps,brief assessment report onhydrology, soil investigation of twolocation and determination of loadclass (vehicular bridge only),2nd 3. Submission of Detailed EngineeringDesign Package. (Approval willsubject to third part validation)3,4 20%10 Aug20264. Submission of Bidding package.3rd 5. Submission of mid-term technicaladvisory and supervision notes andshop drawings.5 30%15 Jan20274th 6. Submission of final technicaladvisory notes & supervision report,As built drawings.6,7 30%30 Apr20277. Submission Final report6. Team Composition and Estimated TimeThe Consultant firm shall provide the required staff and qualifications to manage all the differenttasks of the assignment. Client reserves the right to reject and/or instruct removal of staff due tononperformance.Key Staff Qty Month TotalmonthsRoleLead Bridgedesign/structural engineer1 3 3 Structural design + overallsupervision oversightResident engineer 1 6 6 Full-time supervisionSite inspectors 2 6 12 Monitor daily construction worksQuantity surveyor 1 2 2 BOQs, cost estimates, IPCcertificationSafety expert and trafficmanagement1 6 6 Safety, traffic management,Surveyor 1 1 1 Topographic survey/setting-outSurvey helper 2 1 2 helperGeotechnical Engineer 1 0.5 0.5 Soil investigationPage 7 of 97. Evaluation ProcessProposal / Quotation shall be opened at the opening committee; Procurement office shall remainresponsible for reviewing and initiating the evaluation process. Offers should be compliance withthe deliverables. Purchase Order / Contract will be issued to the lowest compliance quotation /proposalTechnical proposals will account for 70% of the total score. The Only firms achieving theminimum technical qualifying score will proceed to the next step. The work will be awarded tothe lowest cost compliance proposal / quotation.Technical Evaluation Criteria (100 points)7.1.1 Experience (25 points)Criteria PointsExperience in bridge designExperience in design of steel bridges andassociated structures10Experience in constructionsupervisionExperience acting as Engineer/consultant forsupervision of bridge or infrastructure works10Experience in conductingstudiesExperience in conducting topo survey and soilexploration3Experience with government /international organizationsExperience working with public sector ordevelopment partners27.1.2. Methodology (35 points)Criteria PointsUnderstanding of theassignmentUnderstanding of bridge design, investigationsupervision role, and project context in Karachi5Approach for surveysand investigationsMethodology for topo survey, soil investigation,hydrology assessment, and traffic analysis5Engineering designapproachApproach for concept design, structural analysis,design standards (NHA, AISC, ASTM, ACI),corrosion protection10Approach forconstruction supervisionSupervision strategy, QA/QC system, review ofcontractor submissions, monitoring compliance andresource efficiency8Work planLogical sequencing of tasks and completion induration5Risk managementIdentification of design and construction risks andmitigation measures2Page 8 of 97.1.3. Key Staff Evaluation Criteria (40 Points)Position Key Evaluation Criteria ScoreBridge Design /Structural Engineer(Team lead)Education in Civil/Structural Engineering, Registrationwith PEC. minimum 10 years’ experience in bridge designand structural analysis, experience in steel bridges andconstruction supervision10Resident EngineerDegree in Civil Engineering, minimum 8 years’Registration with PEC, experience in constructionsupervision of infrastructure or bridge projects.8Site Inspectors (2)Diploma/BSc Civil Engineering, minimum 5 years’experience in site supervision of civil works, experience inmonitoring construction quality and safety7Quantity SurveyorDegree/Diploma in Civil Engineering or QuantitySurveying, minimum 5 years’ experience in BOQs, costestimates, and certification of contractor payments4Safety and TrafficManagement personalMinimum 5 years’ experience in construction safety andtraffic management for infrastructure projects3SurveyorDiploma in surveying, minimum 5 years’ experience intopographic surveys and construction layout setting-out3Geotechnical EngineerDegree in Geotechnical, 5 years’ experience in soilinvestigation and foundation design58. Eligibility• Firm registered with SECP ad Private Limited Company or equivalent legal entity• Valid PEC registration (Category relevant to bridge design).• The firm must have successfully completed at least two bridge design assignments of similarnature during the last seven years, supported by completion certificates or client references.• Active Taxpayer / Sales Tax Registered (Last 03 Years Tax returns)• Company Profile with Engineering Staff on pool• Firm Not Black listed (Affidavit on Stamp Paper confirming that the firm is not blacklistedby any Federal/Provincial Government Department Consultancy)• Adequate technical staff and equipment• The firm must declare that it has no conflict of interest related to the assignment.A Consultant firm who (i) who not meet eligibility criteria and scoreless then 70% will benon-compliance quotation and will not be considered further.Financial Evaluation Criteria• All Quotations should be clear, concise, comprehensive and itemized according to thespecifications and quantities. Quotations should be in local currency and shall be subject toarithmetic review of prices. Where total prices are incorrect, unit prices should govern.Page 9 of 99. Submission requirementsA. Technical Proposal / Quotation: The Technical Proposal / quotation shall include thefollowing:1. Methodology and approach describing the understanding of the assignment and proposedimplementation strategy.2. Work plan and implementation timeline indicating the sequencing of activities and deliverables.3. CVs of proposed key staff demonstrating relevant qualifications and experience.4. Company profile, including legal registration details and valid Pakistan Engineering Council(PEC) registration.5. Certificate of incorporation from SECP6. Evidence of similar assignments, including brief descriptions of relevant bridge design orinfrastructure projects completed by the firm.7. List of available equipment, software, and technical resources relevant to the assignment orlease agreements.B. Quotation: The Financial quotation shall include below submit in the provided format.This section is for financial proposal / quotation and should be submitted. The firm is expected toquote full cost to complete the task within the stipulated timeframe. Cost breakdown linked to thedeliverables outlined in the TOR. Total lump-sum price for the assignment including any applicabletaxes. The estimated budget for this assignment is around US$ 16,300This section is for Price Quotation and should be submitted along with the supportingdocument / eligibility criteria (email ID and address is provided in article 2.)before the deadline. Incase of email, the title of the email should be - (Survey,Design, and Construction Supervision)S. No Component PKR1 Conducting topographic survey and preparation and submission ofsurvey drawings and report required for bridge design, complete in allrespects. (One pedestrian and one vehicular bridge)2 Carrying out soil investigation (drilling included) and geotechnicalanalysis, complete in all respects, including foundationrecommendations and submission of a geotechnical report for bridgedesign. (one pedestrian and one vehicular bridge)3 Detailed engineering design, drawings, BOQ, engineering estimates,bidding package etc4 Miscellaneous (Light traffic load assessments, Survey Control andSetting Out Checks)5 Construction supervision of two bridges for 6 months

Original sector

Building and Construction Machinery and Accessories

Location

Country

Pakistan

Source

Source

United Nations Global Marketplace (UNGM)

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Forest Products and Packaging, Steel, Education, Government, Bridge, Residential, Road, Commercial, Manufacturing (Industrial), Cement, Automotive

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender