Survey Services
The scope, dates and status of this tender. A free account opens every field.
Source: Missouri Purchasing Group
1 . Boundary Survey Services : • Prepared in compliance with Missouri Code of State Regulations ( CSR ), Chapter 60 , which includes the minimum standards for property boundary surveys . Said survey should include at a minimum : • Research of available record information for subject and adjacent parcels . • Field investi
- Status
- Closed
- Sector
- Water Supply and Storage, Forest Products and Packaging, Waste Processing and Treatment, Education, Power Transmission, Power Generation (CCGT)
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Survey Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Boundary Survey Services : • Prepared in compliance with Missouri Code of State Regulations ( CSR ), Chapter 60 , which includes the minimum standards for property boundary surveys . Said survey should include at a minimum : • Research of available record information for subject and adjacent parcels . • Field investigation of the subject parcels to search for physical monuments , analyze evidence of occupation , and locate any significant features or the land . • Boundary monuments will be set where not found . Reference monuments shall be placed where the parcel corner is unoccupiable . • Boundary survey shall be prepared indicating all pertinent information as identified in Missouri Code . Information shall include boundary corners , evidence or occupation , lengths bearing and area for subject parcel , pertinent record data , adjacent landowner information , and surveyor ’ s certification . 2 . Topography Survey Services : • Topography survey shall include mapping of all existing natural or constructed features within the limits of the subject parcel ( to be determined ). Said topographic survey shall include at a minimum : • Location ( s ) of structures , pavements , walks and all other permanent improvements . • Location and description of fences and walls . • Site data complete enough to produce Contours at one ( 1 ) foot intervals . All elevations shall be accurate to . 01 ’ on improved surfaces and 0 . 1 ’ on unimproved surfaces . • Existing onsite utilities as observed in the field or staked by utility owners . • Data shall be gathered within the site ( to be determined ), and an area 25 ’ outside the perimeter of the site . 3 . Existing Conditions Plan : • Based on boundary and topographic survey services the existing conditions plan shall include at a minimum : • North Arrow , Scale Bar , Legend , General Site Vicinity Map , and Benchmark Data . • Detailed map showing topography area , with contours and elevations listed as needed . • Structure locations and descriptions with inverts labeled per field location if available and record information as needed to supplement . • Underground utility connections as shown on record drawings / field staked by others . • Overhead utility lines . • Current zoning information for parcel ( to be determined ) & adjacent parcels along with setback requirements . • Ownership of adjacent parcels . • FEMA Base Flood Elevation shall be shown per current Flood Insurance Rate Maps . • Base mapping shall be produced on 24 ” x 36 ” paper at an appropriate scale to show all data ; additional pages as needed to show greater detail . • Digital files of base mapping and Existing Conditions Plan ( s ) shall be provided in Civil 3D 2019 or greater . Existing sanitary , storm or combined gravity sewer shall be modeled in pipe networks . Existing surface shall be provided in . dwg files and an export . xml file as well . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Forest Products and Packaging, Waste Processing and Treatment, Education, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
