Surveying and Platting of Aniak - Doestock II RRCS Subdivision
Closed · Alaska · Last reported Mar 2026
Source: Alaska Purchasing Group
THE PURPOSE OF THIS RFP IS TO SOLICIT PROPOSALS FOR A PROFESSIONAL SERVICES CONTRACT FOR THE SURVEYING AND PLATTING OF ALASKA STATE LAND SURVEY NO . 2026 - 03 , CONSISTING OF TWENTY ( 20 ) PARCELS . THIS PROJECT IS LOCATED NEAR ANIAK IN THE UNORGANIZED BOROUGH ( UOB ) 300 MILES NORTHWEST OF ANCHORAGE , AT THE
- Status
- Closed
- Sector
- Water Supply and Storage, Forest Products and Packaging, Road
- Location
- Alaska, United States of America
- Updated
- 3 Nov 2026
- Source
- Alaska Purchasing Group
ConstructChat
Ask ConstructChat about Surveying and Platting of Aniak - Doestock II RRCS Subdivision
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | THE PURPOSE OF THIS RFP IS TO SOLICIT PROPOSALS FOR A PROFESSIONAL SERVICES CONTRACT FOR THE SURVEYING AND PLATTING OF ALASKA STATE LAND SURVEY NO . 2026 - 03 , CONSISTING OF TWENTY ( 20 ) PARCELS . THIS PROJECT IS LOCATED NEAR ANIAK IN THE UNORGANIZED BOROUGH ( UOB ) 300 MILES NORTHWEST OF ANCHORAGE , AT THE CONFLUENCE OF THE ANIAK RIVER AND DOESTOCK CREEK . SCOPE OF WORK The Department of Natural Resources , Division of Mining , Land and Water is soliciting proposals for survey and platting services . Refer to the Special Survey Instructions and the Plan of Survey for Alaska State Land Survey ( ASLS ) No . 2026 - 03 ( Attachments A & C ) for specific surveying and platting requirements for this project , and the Attachment for Special Surveying Instructions for additional surveying and platting requirements . The State will provide the contractor with : • A digital copy of known record plats and other record documents . It is the contractor ’ s responsibility to ensure that research is complete and accurate . • DNR ’ s title report ; • DNR ’ s Special Survey Instructions , the Attachment for Special Survey Instructions , and the Plan of Survey ; • Primary monuments , bearing tree tags ( as applicable ) and magnets . The contractor shall provide secondary monuments , witness posts and survey lath . DELIVERABLES The contractor will be required to provide the following deliverables , included within the five tasks listed below : Task 1 – Control Survey and Preliminary Fieldwork : i . Tie control monuments . ii . Tie applicants ’ claim corners iii . Parcels not in conflict with the staking requirements or survey instructions may be monumented at the time the claim corners are tied . iv . As - built / locate survey of : 1 . Roads , trails & etc , if any , within or adjacent to the parcels being surveyed . 2 . Above & below ground utilities in the project area and within 100 ’ of the parent parcel boundary ( none are anticipated ). 3 . All permanent & non - permanent improvements within the project area and within 50 ’ of the parent parcel boundary . 4 . Navigable & public waterbodies and apparent wetland areas . 5 . Eagle nest trees ( if applicable ). 6 . Cultural Resources ( if applicable ). v . Establish the ordinary high water line ( OHWL ) of navigable & public waterbodies . vi . Perform sufficient measurements on an existing or set primary monument to obtain an OPUS Shared Solution . vii . Address any additional information required by the Unorganized Borough , if applicable . viii . Submit a detailed field report . Task 2 – Subdivision Design and Preliminary Platting : i . Identify any problems or conflicts . ii . Identify surveyed and / or protracted section line easements . iii . Determine the positions of any controlling unmonumented corners . iv . Provide DNR with draft preliminary subdivision design . Deliverables include : 1 . A detailed project report / narrative discussing the project , field procedures used , conditions found , proposed solutions to problems , adjustments made to the parcel boundaries , and any other pertinent data ; 2 . An AutoCAD drawing compatible file and a PDF document printable at scale ; 3 . Digital copies of field notes , computations , proposed parcel closures and areas , and georeferenced photographs of recovered monuments . 4 . A design plan showing recovered monuments , proposed parcels , and proposed and / or set monuments ; the first preliminary plat submitted for review shall show the boundary of the parcel as staked by the lessee depicted with light dashed lines . 5 . As - built and locate information , including eagle nest trees and / or cultural resources ( if applicable ). v . Draft Preliminary Plat submittal ( one full size paper copy at scale ) showing final parcel design . Include all information ( notes , certificates , title block , etc .) required by the platting authority for a Preliminary Plat submittal . Refer to the “ Preliminary Plat Submittal ” section of the Special Survey Instructions for additional required supporting documentation . vi . Written approval by DNR of the draft preliminary plat is required prior to subdivision monumentation . Task 3 – Monumentation Survey : i . Monument parcels . ii . Perform additional fieldwork not completed in Task 1 ( if applicable ). iii . Submit a detailed field report . Task 4 – Final Platting : i . Submit the draft final plat to DNR for review , 1 . Include supporting documentation not previously submitted , 2 . Additional plat review submittals ( as needed by DNR ). ii . Upon approval from DNR , submit final plat on mylar and supporting data in electronic format . |
Location
Country | United States of America (USA) |
State | Alaska |
Source
Source | Alaska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Forest Products and Packaging, Road |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- Wastewater Capital Plan Delivery - Program Management Consultant
- As-Needed Health and Safety Rescue Related Training
- As-Needed Wastewater and Stormwater Services
- Southeast Water Pollution Control Plant (SEP) Program Construction Management (CM) Services
- Re-Bid: Collection System Division - External Audit of the Environmental Management System
- Demonstration Garden Operation and Educational Programming (7th and Lawton)
- Sidewalk Garden Project
- As-Needed Engineering Design Services
