SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - CASINGS
Sector: Geothermal • Location: Czechia
Source: TED Europa
This public contract is for supply of critical Long Lead Items - CASINGS - necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Schedule 1 of the draft contract (part 2 of the Tender Documentation).
For more details, please refer to the tender documents.
- Status
- Closed
- Sector
- Geothermal, Education
- Location
- Czech Republic
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - CASINGS
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This public contract is for supply of critical Long Lead Items - CASINGS - necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Schedule 1 of the draft contract (part 2 of the Tender Documentation). For more details, please refer to the tender documents. |
Original sector | Construction structures and materials; auxiliary products to construction (except electric apparatus), Machinery for mining, quarrying, construction equipment, Machinery for mining, quarrying, construction equipment |
Location
Country | Czech Republic |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Geothermal, Education |
Article published date | 2026-06-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
