SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - CASINGS
The scope, dates and status of this tender. A free account opens every field.
Source: TED Europa
This public contract is for supply of critical Long Lead Items - CASINGS - necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Schedule 1 of the draft contract (part 2 of the Tender Documentation).
For more details, please refer to the tender documents.
- Status
- Closed
- Sector
- Geothermal, Education
- Location
- Czech Republic
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - CASINGS
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This public contract is for supply of critical Long Lead Items - CASINGS - necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Schedule 1 of the draft contract (part 2 of the Tender Documentation). For more details, please refer to the tender documents. |
Original sector | Machinery for mining, quarrying, construction equipment, Machinery for mining, quarrying, construction equipment, Construction structures and materials; auxiliary products to construction (except electric apparatus) |
Location
Country | Czech Republic |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Geothermal, Education |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Geothermal tenders in Czechia
- Rekonstrukce a snížení energetické náročnosti budovy ČGS Geologická 577/6, Praha 5
- Rekonstrukce a snížení energetické náročnosti budovy ČGS Geologická 577/6, Praha 5
- Snížení energetické náročnosti ZŠ Mírová
- SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - LINER HANGER AND INSTALLATION SERVICES
- Opravy oplechování a izolací na rozvodech tepelné energie
- Fakultní Thomayerova nemocnice Praha – výstavba centrálního urgentního příjmu, opakované zadání
- Fakultní Thomayerova nemocnice Praha – výstavba centrálního urgentního příjmu, opakované zadání
- „SŠNO BYSTŘICE POD HOSTÝNEM – SNÍŽENÍ ENERGETICKÉ NÁROČNOSTI OBJEKTU ŠKOLY A DÍLEN“ II
