logo

SYSTÈME DE GESTION DE L'ÉNERGIE POUR BPOST SA/NV

Sector: Electric Vehicles (EVs) • Location: Belgium

Source: TED Europa

Tender
Contract Notice

Bpost wishes to implement a future-oriented solution for monitoring, managing and intelligently controlling the energy Bpost wishes to implement a future-oriented solution for monitoring, managing and intelligently controlling the energy flows within some of its buildings, operational sites and logistics infrastructure in Belgium (approximately 100 locations). The contract aims to implement a sca

Status
Closed
Sector
Electric Vehicles (EVs), Warehouse, Energy Storage, Automotive
Location
Belgium
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about SYSTÈME DE GESTION DE L'ÉNERGIE POUR BPOST SA/NV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “SYSTÈME DE GESTION DE L'ÉNERGIE POUR BPOST SA/NV” is a tender record in Taiyo, linked to the Electric Vehicles (EVs) sector. It is issued for works, goods, or services related to Belgium.

Participants

Not available for this record.

Status

Original status

contract notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Bpost wishes to implement a future-oriented solution for monitoring, managing and intelligently controlling the energy Bpost wishes to implement a future-oriented solution for monitoring, managing and intelligently controlling the energy flows within some of its buildings, operational sites and logistics infrastructure in Belgium (approximately 100 locations). The contract aims to implement a scalable, secure and future-proof solution that supports Bpost in optimizing its energy consumption, reducing energy costs and realizing its sustainability and electrification strategy. (See: https://bnode.com/sustainability ) This assignment is part of the further roll-out of the energy transition within Bpost, in which the number of electric vehicles, charging infrastructures, battery storage systems and renewable energy sources will increase significantly in the coming years. The selected solution must be able to monitor, manage and, where applicable, intelligently control the various energy assets in an integrated and safe manner, so that an optimal energy balance is achieved while respecting the technical limitations of the installations, the capacity tariffs, available capacities and the operational needs of Bpost.

Original sector

Architectural, construction, engineering and inspection services

Location

Country

Belgium

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Electric Vehicles (EVs), Warehouse, Energy Storage, Automotive

Article published date

2026-09-16

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender