T32 - D3 - BridgeRehab - Bibb I - 75 - 185188
One of 10,000+ tenders Taiyo tracks in Georgia.
Source: Georgia Purchasing Group
Item # Location / County Route Description 1 MP 171 – 171 . 3 / Bibb I - 75 ( SR 401 ) NB & SB Misc . Bridge Rehab . ( See Plans ) Scope of Work to be Performed The Contractor will be required to perform prep work , removal , installation and cleanup for Bridge Maintenance and Repair defined in this ITB . The Con
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Bridge, Commercial, Cement, Residential
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about T32 - D3 - BridgeRehab - Bibb I - 75 - 185188
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Item # Location / County Route Description 1 MP 171 – 171 . 3 / Bibb I - 75 ( SR 401 ) NB & SB Misc . Bridge Rehab . ( See Plans ) Scope of Work to be Performed The Contractor will be required to perform prep work , removal , installation and cleanup for Bridge Maintenance and Repair defined in this ITB . The Contractor shall supply labor , equipment , tools , means of transportation , traffic control , and incidentals to perform work in accordance to specifications , and to ensure a safe work environment for employees and the traveling public within the time schedule specified . Scope Work under this ITB consists of furnishing all labor , materials , tools , equipment , means of transportation , and incidentals necessary to perform the services . Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel . The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Bridge Maintenance and Repair at such time , and at such location ( s ) as directed by the Engineer . Prior to start of work , Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose . The Contractor will also be responsible for any traffic control , licenses , and permits required to satisfy the duties required herein . When replacing PCC Slabs , the contractor is not allowed to remove the existing slab without being able to puor concrete within seven ( 7 ) calendar days of opening the road surface . Deliverables Delivery of Bridge Maintenance and Repair shall be in accordance with the contract terms . The following deliverables are expected for work performed at the locations referenced in Exhibit 4 - Locations , Descriptions and Estimated Quantities . Scope / Description of Work : Work under this contract consists of Bridge Rehabilitation on I - 75 ( SR 401 ) in Bibb County from MP 171 - 171 . 3 Northbound and Southbound . The contractor shall furnish all labor , materials , equipment , means of transportation , traffic control and incidentals necessary to perform work . This contract shall be bid - per - line . Any damage to GDOT property that occurs during construction shall be repaired or replaced at no additional cost to the department . This includes but is not limited to signs , guardrail , pipes , culverts , drains , bridges , or any other concrete structure . The Contractor shall perform all work in accordance with the plans for this project . A digital copy of the plans is available upon request . The Contractor shall have a certified Worksite Erosion Control Supervisor on site to ensure all necessary erosion control measures are implemented and maintained . The plans for this project call for approximately 540 hours for Work zone Law Enforcement and ( 4 ) Changeable Message signs . This shall be included in the traffic control cost . Contractor shall seal all bridge joints on both northbound and southbound bridges with like kind . This line item shall be bid and paid lump sum . Any incidental items required for the project shall be included in the line item of Removal of Existing Bridge . This project does have time restrictions from 9PM - 5AM . The Contractor shall notify the Thomaston District Office at 706 - 646 - 7661 , forty - eight hours prior to beginning work and shall coordinate with other construction or utility companies working in the area . The Contractor shall notify the Inspector of any changes in the work schedule . 48 - hour notice is required . The contractor shall correspond with the Inspector on all aspects of the project until final acceptance . Any striping disturbed or damaged shall be replaced at no cost to the department . The contractor shall be responsible for locating ( or have located ) any utilities ( such as water , gas , telephone , power ) if required . Contractor shall follow the State of Georgia Standard Specifications Construction of Transportation Systems and Supplemental Specifications , the Special Provisions , and any applicable Construction Standards and Details . Contractor shall have a Certified Traffic Control Supervisor on site any time work is being performed . Contractor shall remove all trash , tires , and any other debris inside the project limits . The contractor shall maintain clean work areas and shall be responsible for the removal of any debris caused by the contractor or any subcontractors . Any necessary licenses or permits required for the disposal of the material shall be the responsibility of the contractor . The disposal of this material shall follow all local , state , and federal laws . Contractors shall grade and permanently grass any disturbed areas along the Right of Way that is created while performing work on the project . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Bridge, Commercial, Cement, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
