logo

T32 - D3 - PCC - HenryI - 75 & I - 675 - 0000183819

Sector: Road • Location: Georgia, United States of America

Source: Georgia Purchasing Group

Tender
Closed

Work under this contract consists of removing and replacing Portland Cement Concrete roadway slabs , as well as Spall Repair and Fiber Reinforced Crack Repair on SR 401 ( I 75 ) and SR 413 ( I - 675 ) in Henry County . The Project limits are from Mile Post 226 - 228 . 48 on I - 75 and MP 0 – 0 . 73 on I

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Bridge, Cement
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about T32 - D3 - PCC - HenryI - 75 & I - 675 - 0000183819

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “T32 - D3 - PCC - HenryI - 75 & I - 675 - 0000183819” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Work under this contract consists of removing and replacing Portland Cement Concrete roadway slabs , as well as Spall Repair and Fiber Reinforced Crack Repair on SR 401 ( I 75 ) and SR 413 ( I - 675 ) in Henry County . The Project limits are from Mile Post 226 - 228 . 48 on I - 75 and MP 0 – 0 . 73 on I - 675 in the Northbound and Southbound lanes . The contractor shall furnish all labor , materials , equipment , means of transportation and incidentals necessary to perform work . Attached is a map and a list of approximate quantities for estimating purposes only . It is the intent of this contract that all damaged slabs , cracks , spalls , and joints be repaired within the project limits . This project shall be bid per line item . A . Removal items : Existing slabs , spalls , and cracks wider than ½ inch shall be removed and disposed of by the Contractor daily . All dust and debris resulting from work on this contract shall be removed daily from any shoulders and roadway surfaces at no additional cost to the Department . All debris shall be removed from underneath guard rails to allow for positive drainage . B . Replacement slabs shall be constructed according to Pavement Details P - 2 . C . Slabs are estimated to be 10 inches in depth . Additional quantities added for slabs that may be over 10 inches in depth as well as for areas that may have gotten worse since the time of vetting . D . One off approach slab shall be replaced on the I - 675 south bound bridge over I - 75 . The cost of removal and replacement shall be included in the bid item . E . Disturbance to the base below slabs shall be repaired properly at no cost to the Department . F . Slabs that are cracked but not to the severity that warrant replacement shall be sealed as per the item Fiber Reinforced Crack Repair . All locations are to be determined at the engineer ’ s discretion . G . Spalls and cracks shall be repaired with a type IV fiber reinforced concrete material that is grey in color as per specifications and QPL 27 . This work should follow Detail P - 3 . H . Use preform tape with contrast for striping . The contractor shall replace all striping and RPMs that are affected by the work . This work shall be included in the bid item for traffic control . I . The contractor shall seal all joints made during this work . J . The contractor shall fill all core holes with Fiber Reinforced Material that is Grey in color . K . The contractor shall patch the asphalt shoulder in various locations on I - 75 and I - 675 . Areas needing patching shall be milled 2 feet wide to a depth of at least 6 inches . 19 MM Superpave asphalt will be installed after the milling , cleaning and tacking operation . Milling , cleaning , tacking , and paving shall be bid per the patching line item . L . All quantities attached are for estimating purposes only . The contractor shall verify all quantities onsite for bid purposes . M . Work shall be performed between 10 : 00 P . M . and 5 : 00 A . M . N . Work times may be altered at the Engineer ’ s discretion due to traffic volume . O . Any damage to signs , guardrail , or concrete structures ( i . e . ditch paving , bridge decks , headwalls , etc .) or any other asset that is determined as GDOT property shall be repaired at no additional cost to the Department . P . Any areas approved by the Department for the purpose of staging equipment and materials for the project shall be cleaned of all debris and trash . If soil is disturbed in these areas , the Contractor shall grade the areas smoothly to provide positive drainage and grass and mulch the area as directed by the Engineer before final payment is requested . Q . The Contractor shall be responsible for locating ( or having located ) any utilities ( such as water , gas , telephone , power ) if required .

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Bridge, Cement

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender