T32 - D5 - Drainage - Chatham I - 95 - 184307
Closed · Georgia · Last reported Feb 2026
Source: Georgia Purchasing Group
Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services – District 5 The Contractor will be required to perform prep work , removal , installation and cleanup for Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services defined in this ITB . The Contractor shall supply labo
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about T32 - D5 - Drainage - Chatham I - 95 - 184307
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services – District 5 The Contractor will be required to perform prep work , removal , installation and cleanup for Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services defined in this ITB . The Contractor shall supply labor , equipment , tools , means of transportation , traffic control , and incidentals to perform work in accordance to specifications , and to ensure a safe work environment for employees and the traveling public within the time schedule specified . Scope Work under this ITB consists of furnishing all labor , materials , tools , equipment , means of transportation , and incidentals necessary to perform the services . Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel . The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services at such time , and at such location ( s ) as directed by the Engineer . Prior to start of work , Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose . The Contractor will also be responsible for any traffic control , licenses , and permits required to satisfy the duties required herein . Deliverables Delivery of Drainage Rehabilitation , Repair , Replacement , & Miscellaneous Maintenance Services shall be in accordance with the contract terms . The following deliverables are expected for work performed at the locations referenced in Exhibit 4 - Locations , Descriptions and Estimated Quantities . Remove portions of existing culvert and extend culvert as per the plans . Backfill culvert and stabilize slopes . Worksite Utility Coordination Supervisor is required for the project . The contractor must provide , at the time of bid , references detailing their experience as it relates to the scope of work in this contract to include , but not limited to , project number , location , type of work performed , and who the prime contractor was . Utility Protection Plan , as outlined in Exhibit 4 , shall be submitted to the Engineer for review and approval prior to beginning work . Quality Acceptance General Provisions 101 through 150 . Work shall be performed in accordance with the Standard Specification and per the plans . Any corrective work noted by the Department on or before final inspection shall be corrected by the Contractor . Once corrections are made the Department will make final acceptance of the project . Personnel and Sub - Contractors 4 . 1 Personnel Supervisor At all times , have on the work site as the Contractor ' s agent , a competent , English speaking Supervisor , thoroughly experienced in the type of work being performed . The Supervisor ’ s main duties are to supervise the work crew . Supervisor may serve as a Worksite Traffic Control Supervisor ( WTCS ) if properly certified . The Contractor ’ s Supervisor shall : 1 . Have a working cell phone with them during duty hours 2 . Must be available at the work site when the work is being performed under this Contract , and as requested ; 3 . Act as the Contractor ’ s authorized agent in all communications with the Department 4 . Shall be responsible for inspecting and reporting the need for major or emergency work to the Engineer immediately . Crew Utilize the same crew ( s ) to perform the work in accordance with the requirements herein , whenever possible , so that the personnel can remain familiar with the Project . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Transmission tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- Utility Management System and Services UMSS
- FY2023 Patch Truck
- Desert Willow Perimeter Landscape and Lighting Rehabilitation Phase 2 Project
