T32 - D5 - PCC - Jeff Davis SR19 / 27 - 185793
The scope, dates and status of this tender. A free account opens every field.
Source: Georgia Purchasing Group
Scope Work under this ITB consists of furnishing all labor , materials , tools , equipment , means of transportation , and incidentals necessary to perform the services . Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel . The Contractor must make a
- Status
- Closed
- Sector
- Road, Cement
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about T32 - D5 - PCC - Jeff Davis SR19 / 27 - 185793
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Scope Work under this ITB consists of furnishing all labor , materials , tools , equipment , means of transportation , and incidentals necessary to perform the services . Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel . The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Concrete and Portland Cement Concrete ( PCC ) Pavement Rehabilitation Services at such time , and at such location ( s ) as directed by the Engineer . Prior to start of work , Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose . The Contractor will also be responsible for any traffic control , licenses , and permits required to satisfy the duties required herein . When replacing PCC Slabs , the contractor is not allowed to remove the existing slab without being able to puor concrete within seven ( 7 ) calendar days of opening the road surface . Deliverables Delivery of Concrete and Portland Cement Concrete ( PCC ) Pavement Rehabilitation Services shall be in accordance with the contract terms . The following deliverables are expected for work performed at the locations referenced in Exhibit 4 - Locations , Descriptions and Estimated Quantities . This project involves removing existing white topping slabs and placing Portland Cement Concrete ( PCC ) on SR 19 & SR 19 / 27 in Jeff Davis County , at locations specified in Table 3 of the Invitation to Bid ( ITB ) and Table 12 of the Bid Form . Existing white topping and portions of asphalt will be removed and replaced with Portland Cement Concrete ( PCC ) in accordance with the specifications referenced in the ITB . Asphalt milling will be performed beneath the existing white topping to achieve the required 10 - inch depth for the PCC slabs . Both temporary and permanent pavement markings will be required and shall match existing patterns Quality Acceptance General Provisions 101 through 150 . All services performed and products delivered shall comply with GDOT specifications , guidelines , and design criteria before the deliverable will be accepted . Personnel and Sub - Contractors 4 . 1 Personnel Supervisor At all times , have on the work site as the Contractor ' s agent , a competent , English speaking Supervisor , thoroughly experienced in the type of work being performed . The Supervisor ’ s main duties are to supervise the work crew . Supervisor may serve as a Worksite Traffic Control Supervisor ( WTCS ) if properly certified . The Contractor ’ s Supervisor shall : 1 . Have a working cell phone with them during duty hours 2 . Must be available at the work site when the work is being performed under this Contract , and as requested ; 3 . Act as the Contractor ’ s authorized agent in all communications with the Department 4 . Shall be responsible for inspecting and reporting the need for major or emergency work to the Engineer immediately . Crew Utilize the same crew ( s ) to perform the work in accordance with the requirements herein , whenever possible , so that the personnel can remain familiar with the Project . 1 . Provide staff and staffing levels able to perform the work in accordance with the requirements herein . 2 . Use personnel who are competent , experienced , and skilled in all aspects of Concrete and Portland Cement Concrete ( PCC ) Pavement Rehabilitation Services . The personnel performing these services will be under the sole responsibility of the Contractor . 4 . 2 Subcontractors The Department expects the awarded contractor to be fully able to complete the Work as detailed in this ITB . The Department may consider the use of subcontractors to accomplish the work . All requests to utilize a subcontractor must be submitted in writing and include the following ; Appendix 4 Subcontractor Request Form A notarized copy of Appendix 5 Georgia Security and Immigration Compliance Act Affidavit ( Subcontractor ) A minimum of ten ( 10 ) working days is needed to evaluate a request . If the Department approves the use of a subcontractor , the Contractor will be held wholly responsible for the actions , quality , and timeliness of all work performed by the subcontractor . The Department will communicate with the Contractor ’ s Supervisor regarding all work . Determination of whether a subcontractor is approved is the sole decision of the Department . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo