T32 - D7 - Landscape - I 85 Airport - 118120
Closed · Georgia · Last reported Nov 2025
Source: Georgia Purchasing Group
Work under this ITB consists of furnishing all labor , materials , tools , equipment , means of transportation , and incidentals necessary to perform the services . Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel . The Contractor must make a good f
- Status
- Closed
- Sector
- Waste Processing and Treatment, Metal, Chemical (Industrial), Forest Products and Packaging, Airport, Bridge, Water Supply and Storage, Manufacturing (Industrial), Cement, Automotive, Road
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about T32 - D7 - Landscape - I 85 Airport - 118120
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Work under this ITB consists of furnishing all labor , materials , tools , equipment , means of transportation , and incidentals necessary to perform the services . Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel . The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Landscape Maintenance Services ( Project Area ) at such time , and at such location ( s ) as directed by the Engineer . Prior to start of work , Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose . The Contractor will also be responsible for any traffic control , licenses , and permits required to satisfy the duties required herein . Terms and Definitions ANSI : – American National Standards Institute current edition . http :// ansi . org / Approval / Acceptance : Inspected and approved by the Engineer for compliance with the requirements of the Specifications included in this Contract . Engineer or his Designee : The Department ’ s inspector , ( hereafter referred to as the “ Engineer ”). Mainline : The area ( s ) between interchanges on interstates , limited access routes , and state routes . Limited Access Highway : A Highway or arterial road for high - speed traffic which has many characteristics of a controlled access highway ( interstate ), including limited or no access to adjacent property . Travel Way : The actual road lanes in which vehicles travel not including paved shoulders MUTCD : The Manual on Uniform Traffic Control Devices ( MUTCD ), current edition . Standard Specifications ( Specifications ): State of Georgia Standard Specifications for Construction of Transportation Systems , 2013 Edition or latest edition , the Project Special Provisions , the Georgia Department of Transportation , Supplemental Specifications , Standard Drawings and Construction Details . Doing Business with the Georgia Department of Transportation ( ga . gov ). Right - of - Way ( R / W ): The entire portion of a highway within the boundaries of access - control fences or access - control lines where no fences exists . Debris : Material associated with the tree cutting and pruning operation including stems , branches , bark , leaves , etc . Litter : Litter may consist of paper , boxes , bottles , cans , tires , recaps , rubber pieces , mattresses , appliances , lumber , metal pieces , hubcaps , vehicle parts , dead animals , memorials and other items not considered normal to the right of way . It is not intended for small objects such as cigarette butts , chewing gum wrappers and similar sized items to be removed under this work . General Routine Maintenance Activities : Litter and debris removal , pest and disease control , edging , insect and fire ant control , chemical and hand weed control , exotic pest plant control , shrub and tree pruning and removal for health safety , sight and signage visibility , fertilizing , swale and inadequate drainage inspection , maintenance and minor repair . Mowing / Line Trimming Cycle : Mowing of lawn grasses and clearing natural areas to within a specified height using mowing , slope mowing and line trimming equipment . It includes areas of lawn or mowable natural areas on 3 : 1 slopes or flatter , including grassed islands and areas fifteen ( 15 ) feet behind guardrail . Mowing consists of completely mowing , edging , miscellaneous mowing and trimming the grounds of a Project area Mowable ( turf ) Areas : Include all turf areas within the Project Area . All mowing shall conform to previously established mowing limits . Additional maintenance activities include but are not limited to : mowing , aeration , soil test - lime application , weed control / herbicide application at signs and obstacles , fertilizing trees . Mowable / Natural Areas : Include existing tree masses under which understory vegetation has been removed for safety , functional or aesthetic purposes . Pine straw and / or natural leaf litter are allowed to accumulate beneath the tree mass area up to a four ( 4 ) inch depth . Additional maintenance activities include but are not limited to : occasional line trimming and / or mowing , weed removal , and fertilizing small caliper trees . No Mow Areas / Natural Areas : Include existing vegetation areas in which trees and understory plants are left undisturbed except for the routine maintenance activities and pruning . Obstacles : Items located within the Project Area , both natural and man - made , which may include but are not limited to the following : sign posts , delineator posts , light posts , headwalls , catch basins , etc . Vegetation : All woody and herbaceous plants either naturally occurring or planted . Vegetation Masses : Include shrub , ground cover and / or tree masses , bedding plants , hedges , buffer areas , areas between the guardrail and shrub beds and slope plantings . Additional maintenance activities include but are not limited to : selective plant removal , minor planting , re - mulching , weed removal ( pre and post emergent herbicide applications ) and soil tests to determine fertilization requirements . Equipment All equipment contemplated for use shall be subject to inspection and acceptance for mechanical worthiness and appropriateness for the work intended by the Engineer . Department decisions relevant to mechanical worthiness and appropriateness shall be final . Equipment left on the right of way is the responsibility of the Contractor . Equipment may be parked outside of the clear zone or behind positive barrier property overnight with the approval of the Engineer . Equipment requirements per crew are as follows : Mowing / Trimming / Edging Equipment : The equipment used for mowing shall be of sufficient type , capacity and quantity to safely and efficiently perform the mowing work specified in this service agreement . Have acceptable guards on all open portions of the mowers to prevent objects from being thrown from under the mower while in operation . Any mower deemed unacceptable by the Engineer will not be allowed to operate until such guards are in place and properly maintained . Properly maintained mower blades , i . e . sharp and straight . Mower with a blade is deemed unacceptable to the Engineer shall be prohibited to operate until such blade is replaced or the deficiencies are corrected . Trim crews shall consist of string or blade type trimmers with acceptable guards . Tree / Shrub Maintenance Equipment : Use equipment that will not damage the bark and cambium layer on or in the tree or shrub . Use sharp tools to ensure clean cuts are made at all times . Pruning that cannot be performed safely while standing on the ground requires the services of an ISA certified professional . Aerate Equipment : Only use machines specifically designed for these purposes such as plug type aerators and verticut machines Materials Submit a list of all pesticides to be used for the purpose of these specifications . Include lables and Safety Data Sheets ( SDS ) for each pesticide . The Engineer must approve or disapprove of the intended pesticide to be used prior to any application being performed . Landscape Maintenance Service Basic Requirements Mowing / Line Trimming This work includes mowing , line trimming and edging areas within the limits of the Project Area according to this Service Agreement and the Engineer . Mowing Visually inspect the lawn areas a minimum of once a week for leaves , debris litter and trash . Remove any leaves , debris , litter and trash from the lawn areas minimum of once a week and / or prior to each mowing . Maintain turf height at a height ranging from three ( 3 ) inches to four ( 4 ) inches Prior to mowing , remove all objects that could become a hazard if struck by mowers such as litter , debris , trash bags , large cardboard boxes , mattresses , pillows , tires and recap pieces , pine cones , etc . Sweep or blow pavement areas after each mowing . Mowing areas that are saturated with water or where standing water is present , is prohibited . Mowing operations are prohibited when conditions are such that turf damage would occur or tire ruts will be left . ( See line Trimming ) Chemical control of turf is prohibited . Contact the Engineer and receive department approval prior to performing any chemical control of weeds . Slope Mowing Performing slope mowing in areas not accessible with conventional mowing equipment such as beyond concrete ditch paving , slopes greater than 3 : 1 , wet areas , bridge end rolls , behind guardrail , etc . In lieu of slope mowers , blade or string - type trimming equipment is acceptable for use . Miscellaneous Mowing Requirements |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Metal, Chemical (Industrial), Forest Products and Packaging, Airport, Bridge, Water Supply and Storage, Manufacturing (Industrial), Cement, Automotive, Road |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
