logo

Telluride Mill Creek Water Treatment Plant Chlorine Conversion Project Telluride

One of 10,000+ tenders Taiyo tracks in Colorado.

Source: Town of Telluride - Colorado

Tender
Closed

This project includes the removal of existing gaseous chlorine and batch day tank chlorination systems and the installation of a new calcium hypochlorite tablet feeder system at the Mill Creek Water Treatment Plant ( MCWTP ), located in a high - alpine environment serving the Town of Telluride . MCWTP is a 1

Status
Closed
Sector
Chemical (Industrial), Water Supply and Storage, Automotive, Waste Processing and Treatment, Manufacturing (Industrial)
Location
Telluride, Colorado, United States of America
Updated
3 Nov 2026
Source
Town of Telluride - Colorado

ConstructChat

Ask ConstructChat about Telluride Mill Creek Water Treatment Plant Chlorine Conversion Project Telluride

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Telluride Mill Creek Water Treatment Plant Chlorine Conversion Project Telluride” is a tender record in Taiyo, linked to the Chemical (Industrial) sector. It is issued for works, goods, or services related to Telluride, Colorado, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This project includes the removal of existing gaseous chlorine and batch day tank chlorination systems and the installation of a new calcium hypochlorite tablet feeder system at the Mill Creek Water Treatment Plant ( MCWTP ), located in a high - alpine environment serving the Town of Telluride . MCWTP is a 1 - mgd drinking water treatment facility utilizing conventional pretreatment followed by membrane filtration . The facility operates under two CDPHE - approved disinfection segments :• Segment 1 – Pretreatment • Segment 2 – ClearwellThe existing chlorination systems rely on gaseous chlorine and batch chemical preparation within an enclosed chlorine room . The Town intends to convert to an AccuTab - style ( Westlake Water Systems ) tablet feeder system to improve operator safety , system reliability , chemical handling , and winter accessibility . This project is being implemented in accordance with CDPHE , WQ - DW - Policy - DW005 - 2024 Design Criteria Policy for Potable Water Systems and has been approved for construction based on a design submittal of drawings and a Basis of Design Report ( BODR ). Mill Creek Water Treatment Plant is the primary treatment plant for the Town of Telluride and therefore the time the plant is offline for construction must be minimized . The Contractor will coordinate all down - time with the Town . Start - up of the chlorine system bust be completed by Monday , May 25th , 2026 ( Memorial Day ). The Town has engaged a design consultant for the preparation of the design , construction services , and preparation of the asbuilts . The Town ’ s electrical and controls consultant was engaged in the design and will be executing the integration of the chlorine system into the existing SCADA . The Town has design consultant ( KMS ) and electrical controls consultant ( SKM ) that will require coordination . See more

Location

Country

United States of America (USA)

State

Colorado

City

Telluride

Source

Source

Town of Telluride - Colorado

URL

More Details

Record type

Tender

Sector

Chemical (Industrial), Water Supply and Storage, Automotive, Waste Processing and Treatment, Manufacturing (Industrial)

Article published date

2026-02-26

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender