Temporary VIP Structure
Sector: Stadium • Location: Georgia, United States of America
Source: Georgia Purchasing Group
The purpose of this RFP is to secure a Temporary VIP Structure vendor for FIFA Fan Festival Atlanta . A safe and structurally sound build that is in like - new condition is of the utmost importance . Your team must have extensive experience in building structures and major events . Anticipated capacity is
- Status
- Closed
- Sector
- Stadium, Hotel, Power Generation (CCGT), Commercial
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Temporary VIP Structure
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The purpose of this RFP is to secure a Temporary VIP Structure vendor for FIFA Fan Festival Atlanta . A safe and structurally sound build that is in like - new condition is of the utmost importance . Your team must have extensive experience in building structures and major events . Anticipated capacity is between 250 and 500 . The event venue is Centennial Olympic Park in Atlanta , GA . Scope of Work 1 . Structure a . 12 . 5 meter x 30 meter structure ( Losberger or similar ), including all ballast b . At least 3 . 4 meter legs c . Interior Eve hardwall inset 5m ( creating a 7 . 5m x 30m interior area ) d . Glass wall on front ( 30m ) and sides ( 7 . 5m ). Hardwall on back ( 30m ) e . Glass handrail along front 30 meter run and 5 meter of exterior on each side 2 . Substructure , Ramps & Stairs a . Leveled floor total footprint of 13 meters deep x 21 meters long i . 11 meters deep x 31 meters long @ 4 ’ h ii . 1 . 5 meters deep x 31 meters long @ 3 ’ h ( front edged ) b . Event carpet on all flooring c . Full black scrim wrap around entire base d . ( 1 ) ADA ramp e . ( 2 ) Stairwells 3 . Dates a . Load - In Dates : Tuesday , May 26 – Wednesday , June 11 ( Primary structure completed by June 2 ) b . Event Dates : ( 21 ) Event Days from Thursday , June 11 – Wednesday , July 15 c . Load - Out Dates : Thursday , July 16 – Wednesday , July 22 4 . Details a . Event will handle permitting process , but vendor required to include and provide stamped engineering drawings b . Vendor should plan on providing lodging , expenses , and heavy equipment in their bid c . Selected vendor will be required to collaborate with selected temporary power and HVAC vendor d . Include fire and life safety package ( exit signs , fire extinguishers , requisite signage , egress plan , etc .) e . Space will be limited . All trucks should expect to drop and leave site once offloaded unless otherwise advanced . Please clarify all costs associated with keeping your trucks off - site in your budget . 5 . Site Surveys a . Selected contractor may be required to visit the site following the award of this contract to perform a site survey with the production team between March and April . Best efforts will be made to accommodate everyone ’ s schedule . Flights and hotels for this site survey shall be the responsibility of the selected contractor . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Stadium, Hotel, Power Generation (CCGT), Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Stadium tenders in United States of America
- Graphic Designer Request for Proposals
- Electric CostofService Analysis Rate Design Study
- RFQ 933002022JM Roof Drain at Scope Arena Unclogging and Cleaning Services
- 23B38LL Ocean Center Floor Boxes
- 0.51 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps and pavement markings on Howard Street from Stadium Drive to Oakland Drive in the city of Kalamazoo, Kalamazoo County. This is a Local Agency project. 4.00 % DBE participation required
- Resurfacing and intersection improvements on Court Street from Stadium Drive to Hilltop Drive in Pekin.
- HMA resurfacing with pavement patching, dowel bar retrofitting, thermoplastic pavement markings and signage on University Drive from University Park Drive to Stadium Drive on the SIU Campus in Edwardsville.
- HMA resurfacing with pavement patching, dowel bar retrofitting, thermoplastic pavement markings and signage on University Drive from University Park Drive to Stadium Drive on the SIU Campus in Edwardsville.
