Work includes providing and installing the unitized , modular , enclosed landfill gas ground flare station including all components necessary for a complete and operational system . The flare station shall be sized to extract , demist , process the condensate , compress and combust a maximum of 3 . 2 MMBtu / hr ( 150

Status
Closed
Sector
Natural Gas, Wind, Advanced Electronics, Power Generation (CCGT), Steel, Manufacturing (Industrial), Seaport, Cement
Location
Washington, United States of America
Updated
3 Nov 2026
Source
Washington Purchasing Group

ConstructChat

Ask ConstructChat about Tenant Way Closed Landfill Flare Replacement Project Enclosed Flare Package

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Tenant Way Closed Landfill Flare Replacement Project Enclosed Flare Package” is a tender record in Taiyo, linked to the Natural Gas sector. It is issued for works, goods, or services related to Washington, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Work includes providing and installing the unitized , modular , enclosed landfill gas ground flare station including all components necessary for a complete and operational system . The flare station shall be sized to extract , demist , process the condensate , compress and combust a maximum of 3 . 2 MMBtu / hr ( 150 SCFM of 35 % methane ) of landfill gas . Other combinations of flow and methane content not exceeding 3 . 2 MMbtu / hr shall be accommodated as long as methane is between 20 % and 35 %, and flow is between 25 and 150 scfm . The combination of these subsystems shall include , but not be limited to , the following components : 1 . Enclosed ground flare rated for Class 1 , Division 2 hazardous area classification a . Automatic actuated shutdown valve b . Flame arrestor c . Burner unit d . Flare stack e . Interconnecting piping and isolation valves f . Pilot and ignition system g . Internal electrical wiring h . Instrumentation and control devices i . Junction and terminal boxes 2 . Gas handling / blower system rated for Class 1 , Division 2 hazardous area classification a . Landfill gas blowers b . Demister / filter system c . Process valves d . Process piping e . System structural skid 3 . Instrumentation and valves rated for Class 1 , Division 2 hazardous area classification 4 . Power control panel and system control panel a . Enclosures / cabinets / junction boxes b . Control and annunciation devices c . Interconnecting conduit and wiring d . PLC supervisory control system e . Ethernet switch for remote connection capabilities f . All required electrical controls , motor controls , annunciation systems , alarm systems , and logic systems 5 . Factory testing and start up support a . Equipment and startup testing b . Perform initial system startup c . Demonstrate compliance with performance requirements as specified d . Provide operation start - up and training for designated personnel e . Prepare and deliver three copies of submittals and operation and maintenance manuals B . System to be factory assembled , pre - wired , calibrated , and tested prior to shipment . C . System shall be pre - piped and pre - wired to the extent possible , requiring minimal field assembly . D . Systems and assemblies furnished under this section shall be designed , manufactured , and / or supplied by a single vendor in the interest of total system compatibility , reliability , quality , cost , and single source responsibility . E . Installation , civil work , electrical interconnections , and permits are by others unless noted . FLARE SYSTEM DESCRIPTION A . Design Requirements 1 . Design system for continuous operation and destruction of LFG . a . System to be designed to operate on 20 - 35 % methane . b . System to reduce emissions in accordance with 40 CFR 60 . 18 and 40 CFR 60 . 752 ( b )( 2 ) iii . System shall reduce NMOC by 98 % by weight , and 99 % DRE of methane . c . System to be designed to comply with WAC 173 - 408 - 080 ( 4 ) Requirements for Flares . System shall achieve a methane destruction efficiency of 99 % by weight . 2 . Provide complete skid mounted blower / flare system to include : a . Structural steel skid with appropriate anchor points for connection to existing concrete slab . Flare shall be able to withstand loads and stresses per the requirements of UBC100 mph wind loading and seismic zone criteria . b . Two ( 2 ) identical blowers , complete with each sized for 480 VAC , totally - enclosed , fan - cooled , inverter duty electric motor rated for installation in NEC 500 Class I , Division 2 environments and direct drive . Blower to be rated for 150 SCFM at - 35 inches WC inlet vacuum and 15 inches WC discharge pressure . Blowers shall have been designed for use with and in the presence of landfill gas . The blower shall include anti - corrosion coating or material suitable in the presence of landfill gas as approved by the manufacturer . c . Enclosed flare sized for 150 SCFM LFG with minimum 7 : 1 turndown . Turndown based on 20 - 35 % methane content and 1600 degrees F . Minimum operating temperature shall be 1400 degrees F . Maximum internal temperature rating shall be 2000 degrees F . d . Inlet demister / knockout sized for 300 SCFM . Knockout to include : 1 ) Multi - layer demister pad / filter rated for 100 % removal efficiency at 6 - micron droplet size . The demister / filter vessel shall be capable of withstanding no less than 5 PSIG pressure / vacuum 2 ) Differential pressure gage across demister pad / filter 3 ) Visual liquid level gage . 4 ) Cleanout access . 5 ) Inspection port . 6 ) Pipe coupling in the bottom of the filter for condensate removal . e . Thermocouples : 3 each , housed in Inconel sheaths f . Test ports for air quality testing sensor access and view ports , one at each thermocouple and two for view of main flame and pilot . g . Eccentric flame arrester . Flame arrestor shall be provided with pressure monitoring such that both flare back pressure and flare and flame arrestor back pressure can be monitored . h . Flame safeguard controller i . Flare temperature controller

Location

Country

United States of America (USA)

State

Washington

Source

Source

Washington Purchasing Group

URL

More Details

Record type

Tender

Sector

Natural Gas, Wind, Advanced Electronics, Power Generation (CCGT), Steel, Manufacturing (Industrial), Seaport, Cement

Article published date

2026-05-01

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender