The Bahamas Water Supply Improvement Project Phase 2
Sector: Water Supply and Storage • Location: The Bahamas
Source: Caribbean Development Bank (CDB)
The objective of the consultancy is to ensure that environmental and health and safety requirements are adhered to during the construction phases of the project. The duration of the assignment is expected to be for a period of thirty-seven (37) months with an estimated time input of approximately 20 hours per week.
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Bahamas
- Updated
- 3 Nov 2026
- Source
- Caribbean Development Bank (CDB)
ConstructChat
Ask ConstructChat about The Bahamas Water Supply Improvement Project Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The objective of the consultancy is to ensure that environmental and health and safety requirements are adhered to during the construction phases of the project. The duration of the assignment is expected to be for a period of thirty-seven (37) months with an estimated time input of approximately 20 hours per week. |
Budget |
Location
Country | Bahamas |
Source
Source | Caribbean Development Bank (CDB) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
