The Collective Off Rome Development Infrastructure Work
Sector: Waste Processing and Treatment • Location: Georgia, United States
This project consists of demolition and removal of existing public sewer main and storm drainage networks, and the proposed improvements include storm sewer, sanitary sewer, and water utility infrastructure. These improvements will be constructed along two new local streets that will connect W. White St and Abby Lane. The demolition and removal of storm sewer networks consist of approximately 201
- Status
- Closed
- Sector
- Waste Processing and Treatment, Road, Power Transmission, Water Supply and Storage, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about The Collective Off Rome Development Infrastructure Work
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This project consists of demolition and removal of existing public sewer main and storm drainage networks, and the proposed improvements include storm sewer, sanitary sewer, and water utility infrastructure. These improvements will be constructed along two new local streets that will connect W. White St and Abby Lane. The demolition and removal of storm sewer networks consist of approximately 201 LF of pipe and 3 structures. The installation of proposed storm sewer networks consists of approximately 1900LF of pipe, and 27 structures. The demolition and removal of sanitary sewer networks consist of approximately 1207 LF of pipe and 4 structures. The installation of sanitary sewer networks consists of approximately 1343 LF of pipe and 10 structures. The installation of public water main consists of approximately 1633 LF of pipe, 4 fire hydrants, and 56 water service lines and meters. Erosion, Sedimentation and Pollution control measures must be implemented, maintained, and removed post-installation. The contractor will be required to maintain good communication and coordination with the Project Engineer and City Engineer through the entire duration of construction activity. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Road, Power Transmission, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States
- Concrete Pavement Services
- Place HMA overlay and replace AC surfacing.
- SB Minor B 03A4145 / Pedestrian Safety Improvement In Colusa, Sacramento, Sierra, Yolo, and Yuba Counties at Various Locations
- Lucky Street Water and Sewer Replacement
- Grantland Water Main Extension Between Shaw & Gettysburg
- Wilson Park Senior Adult Services Accessibility Improvements Project
- SB Minor B 05A3048 - Relocate Controller Assembly in Santa Cruz County
- SB Minor B 03A4143 - Install a Rectangular Rapid-Flashing Beacon in Placer County
