logo

The Installation of Power Supply, Control Systems and Associated Infrastructure for Two Production Water Wells within Metro Vancouver’s Capilano Watershed, North Vancouver, BC

Source: Canada Buy and Sell

Tender
Open

This project involves the installation of power supply, control systems and associated infrastructure for two production water wells within Metro Vancouver’s Capilano Watershed.

The work includes:

  1. Provision and installation of power supply and control system components including but not limited to: VFDs, SCADA sensors, outdoor control kiosk enclosure, control panel, concrete pad, disconne

Tender Information FAQ

Tender Information

5 Q
The tender "The Installation of Power Supply, Control Systems and Associated Infrastructure for Two Production Water Wells within Metro Vancouver’s Capilano Watershed, North Vancouver, BC" is a Tender record in Taiyo, linked to the Water Supply and Storage, Cement, Telecommunications, Warehouse, Power Generation (CCGT), Road, Mass Transit, Commercial sector. It is issued for works, goods, or services related to the local region, , Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

open

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project involves the installation of power supply, control systems and associated infrastructure for two production water wells within Metro Vancouver’s Capilano Watershed. The work includes: 1. Provision and installation of power supply and control system components including but not limited to: VFDs, SCADA sensors, outdoor control kiosk enclosure, control panel, concrete pad, disconnect switches, network switches, junction boxes, well pump power connections, power supply and telecommunication cables & conduits, and sump pumps. 2. Electrical duct bank and conduit runs including trenching, excavation, and backfilling. 3. SCADA and control programming and integration. The Contractor will be responsible for all labour, equipment, transportation, logistics, and coordination with Metro Vancouver and other contractors on-site. The Contractor must perform and complete all work by September 30, 2026. This is a first phase (Phase one) of a two-phase competition: the first phase will pre-qualify bidders based on mandatory requirements as per the attached Request for Qualifications; second phase (Phase two) will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings. The list of pre-qualified bidders resulting from Phase One will be valid for a period of 60 days upon notification of meeting the mandatory requirements or upon award of contract in Phase Two whichever comes first. Security Requirement: There is no security associated with this requirement.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data