The Turnkey Construction of Hybrid Solar Power Plants
Sector: Power Generation (CCGT) • Location: Ukraine
Source: United Nations Global Marketplace (UNGM)
The Turnkey Construction of Hybrid Solar Power Plants 3 LOTS : Lot 1 Kyiv region Lot 2 Sumy region Lot 3 Chernihiv region
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar
- Location
- Ukraine
- Updated
- 3 Nov 2026
- Source
- United Nations Global Marketplace (UNGM)
ConstructChat
Ask ConstructChat about The Turnkey Construction of Hybrid Solar Power Plants
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Turnkey Construction of Hybrid Solar Power Plants 3 LOTS : Lot 1 Kyiv region Lot 2 Sumy region Lot 3 Chernihiv region |
Original sector | Power Generation and Distribution Machinery and Accessories |
Location
Country | Ukraine |
Source
Source | United Nations Global Marketplace (UNGM) |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Solar |
Article published date | 2026-04-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in Ukraine
- Interactive gait laboratory (code DK 021:2015: 33150000-6 — Equipment for radiotherapy, mechanotherapy, electrotherapy and physical therapy)
- Mobile Boilers for Chernihiv, Nizhyn and Pryluky - Urgency
- Supply of a special purpose vehicle for radiation monitoring and post- detection activities
- Mobile Boiler for the Cabinet of Ministers buildings in Kiev
- Procurement of 2 New Funicular Cable Railway Cabins for Carriage of Passengers, Associated Goods and Related Services
- Supply of new low-floor multi-section articulated Tramways 26-27 metres length, including a set of main, wearing and consumable spare parts, a set of equipment and tools for maintenance and repair, and related services, up to a total budget of €7,790,412.00 (seven million seven hundred ninety thousand four hundred twelve euros), sales taxes and customs duties excluded
- Solaranlagen je 38,4 kWp
- Solaranlagen je 180 - 200 kWp
