Thermal Buffer Technology
Sector: Nuclear • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. UKIFS is seeking experts to support the design and development of a thermal storage system that integrates with the STEP power cycle. While the pow
- Status
- Prospective
- Sector
- Nuclear, Cement, Geothermal, Energy Storage, Hydrogen, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Thermal Buffer Technology
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. UKIFS is seeking experts to support the design and development of a thermal storage system that integrates with the STEP power cycle. While the power cycle is designed to efficiently integrate heat from the tokamak device during a high power steady state scenario, the power cycle and cooling systems must also be highly flexible to adapt to uncertain prototypic operations e.g. the systems must have the ability to switch on and off and ramp up and down at the start and end of operational periods. Significant thermal power will be generated from the tokamak device during the ‘rapid density rise phase’ of the reactor plasma ramp up, lasting a few minutes. This is an effective ramp of 2GWth generated from the tokamak during these few minutes. To manage this very immediate and sudden generation of heat from the tokamak, a minimum amount of thermal storage will be needed to increase the thermal inertia of the primary coolant loops, allowing the power cycle to ramp up to 100% load in a timely manner. Further, thermal storage may be needed to enable partial operation of the power cycle during the transition between the initial pre-heat to part load operational period. The thermal storage system will be expected to extract heat from a hot CO2 primary coolant during the ramp up phase and deliver heat back to the CO2 primary coolant (or to a separate secondary working fluid) during the ramp down phase. The proposed technical operating conditions of the thermal storage system and load requirements are: -CO2 primary coolant operating pressure: 50 to 150 bar. -CO2 primary coolant operating temperature: 550°C to 650°C. -Thermal duty in the region of 800MW. -Required energy storage of 150MWh. -Required fast ramping duration in a few minutes. Systems of interest & key words: -Thermal energy storage -Latent heat storage -Sensible heat storage -Thermochemical heat storage -Thermal battery -Molten salt storage systems -Molten salt heat exchangers/ steam generators -Phase change materials -Metallic phase change materials -Solid state energy storage -Packed bed storage -Concrete battery -Sand battery Please note that the CPV codes given in this notice have now been corrected. To view this notice, please click here: https://ukifs.delta-esourcing.com/delta/viewNotice.html?noticeId=1009995808 |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Nuclear, Cement, Geothermal, Energy Storage, Hydrogen, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Nuclear tenders in United Kingdom
- Diagnostic and Capital Equipment and Related Accessories and Services
- Purchase of electronics pod
- HPB - Provision of Radioactive Waste Management Services (AGR Unique Ref. 34 F/W)
- University Interactions - NDA Research Portfolio - Single Supplier Framework
- Manufacturability Assessment of the PEGASUS Transport Package Design
- Collection of Chemical Waste and Paints (Hazardous and Non-Hazardous)
- Manufacture, Supply & Installation of Pipework System
- Manufacture, Supply & Installation of Pipework System
