TII424: OCS Works Framework Agreement
The scope, dates and status of this tender. A free account opens every field.
Source: TED Europa
TII intends to enter into a Single Party Framework Agreement for renewals (Overhead Contact System) on the Luas light rail system. This framework, when established, will be available to TII to draw down from it on a Call-Off Contract basis. The Call-Off Contracts, when issued, will typically be for the purposes of carrying out the following activities:1. Design, supply, installation, testing and c
- Status
- Closed
- Sector
- Mass Transit, Rail, Cable car, Automotive, Power Generation (CCGT), Telecommunications, Road, Commercial
- Location
- Ireland
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about TII424: OCS Works Framework Agreement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract award notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | TII intends to enter into a Single Party Framework Agreement for renewals (Overhead Contact System) on the Luas light rail system. This framework, when established, will be available to TII to draw down from it on a Call-Off Contract basis. The Call-Off Contracts, when issued, will typically be for the purposes of carrying out the following activities:1. Design, supply, installation, testing and commissioning of any Overhead Contact System asset renewals, upgrades or new works. It shall include developing a detailed construction design associated with the various work elements of the Overhead Contact System installations on Luas 2. Developing the specific programme of works, 3. Developing the specific methodology – location based, 4. Developing the Traffic Management design – to be approved by the relevant Local Authority, TII and the Luas Operator, 5. Interface with Luas Operator and Maintainer as required, 6. Carrying out all the necessary works as specified for the Overhead Contact System and/or associated equipment and installations on Luas. Those works will include all preparatory works and all closing out works to make good the affected assets, 7. Production of the Safety File, 8. Supply of materials including contact wire and overhead system components and tooling e.g. Section insulators, cabling, fixings, poles, track interfacing equipment, sealants/grouts and materials used for works on or near the Luas system, and 9. Any other associated works required by the Client; including work on overhead contact system and traction power related equipment such as overhead contact system elements, cabling including traction cables, earthing and bonding systems (e.g. VLDs etc), installation, purchase, interventions of similar equipment, work on on-track-plant, supply of and interventions on tooling, interventions on overhead contact systems such as replacing contact wire, adjusting overhead support systems, work on supporting systems and additional items on surrounding building such as poles and building supports and all works on or near Luas OHLE (Overhead line equipment) asset group, 10. Provide a handover file and as-built drawings in accordance with TII requirements . 11. Carrying out the duties of PSDP and PSCS for all Call off Contracts. TII are inviting expressions of interest from interested parties to be selected to tender with a view to entering into the Contract. Applicants are referred to the Information Memorandum and Pre-qualification Questionnaire (IMPQQ) which provides additional information in relation to the competition. Provided that there is a sufficient number of suitable Applicants, TII intends to invite the number of Applicants (as indicated in this IMPQQ) to tender. Prior to shortlisting any Applicant, TII reserves the right to seek verification of any declarations made in the response to the ESPD/IMPQQ. |
Original sector | Construction work, Construction work, Construction work, Construction work |
Location
Country | Ireland |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Mass Transit, Rail, Cable car, Automotive, Power Generation (CCGT), Telecommunications, Road, Commercial |
Article published date | 2026-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Mass Transit tenders in Ireland
- Multi-party Framework for provision of Engineering Consultancy and PSDP Services for Road, Transport, Public Realm and other Infranstructure Projects (2026-2030)
- Muckish Railway Walk - Phase 3
- Provision of Fare Evasion Survey Services
- Provision of Services for maintenance services at Traveller specific accommodation sites at a number of locations in Co. Tipperary
- 9598 Rail Survey Equipment
- MetroLink M500 Service Delivery Partner
- N25 Rosslare Europort Access Road Scheme
- TII525 - Independent Safety Assessor
