Timber Bridge Design , Fabrication and Delivery
One of 3,321 tenders Taiyo tracks in MITN.
Source: MITN Purchasing Group
SCOPE OF SERVICES 1 . Geometry : The bridge superstructure is to fit on existing abutments . Plans and survey data for the existing structure are provided as an attachment to this RFP . 2 . Design : The superstructure shall be designed and detailed as a laminated timber slab span utilizing longitudinal spike
- Status
- Closed
- Sector
- Rail, Forest Products and Packaging, Bridge, Manufacturing (Industrial)
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Timber Bridge Design , Fabrication and Delivery
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF SERVICES 1 . Geometry : The bridge superstructure is to fit on existing abutments . Plans and survey data for the existing structure are provided as an attachment to this RFP . 2 . Design : The superstructure shall be designed and detailed as a laminated timber slab span utilizing longitudinal spike laminated panels . Glued laminated panels will not be allowed . Deck width shall be comprised of multiple panels interconnected with shiplap joints and supplemented with transverse spreader beams bolted underneath the longitudinal panels . Spreader beam size , spacing , and bolt spacing shall follow AASHTO guidelines . Design of the superstructure shall be in accordance with the following criteria : a . Unless otherwise specified , all dead loads , applied loads and live loads shall be as specified in the AASHTO LRFD Bridge Design Specifications . b . Dead load shall include a 2 ” nominal crowned HMA wearing surface installed over the top of the deck panels and additional 2 ” future HMA wearing surface . The HMA application rate shall average 357 lbs ./ syd . with a minimum 1 . 3 % cross slope for drainage . c . Live loads shall be HL - 93 Modified as designated in the Michigan Bridge Design Manual 7 . 01 . 04A . d . Bridge deflection requirements shall be in accordance with AASHTO LRFD Bridge Design Specifications . e . Individual element dimensions shall be determined by the manufacturer . Timber railing system shall attach to longitudinal deck panel system . Railing system shall be crash - tested to Test Level 3 ( TL - 3 ) in accordance with the current version of the AASHTO Manual for Assessing Safety Hardware ( MASH ). Connection of rail components must be to the longitudinal deck panels only . No connection of rail components to the substructure will be permitted . The design , design calculations , and certification must be signed and sealed by a Licensed Professional Engineer registered in the State of Michigan ... |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Rail, Forest Products and Packaging, Bridge, Manufacturing (Industrial) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Rail tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- PreQualification of Bidders for Chaboya Improvements
- TOWN OF MANCHESTER PARATRANSIT SERVICES
- Stormwater Management Improvements Ocean County Fire Training Facility Ocean Township
- Work Related Activity Providers Opioid Affected Individuals
- WORKPLACE HARASSMENT PREVENTION TRAINING
- Industry Review Phase Eastridge to BART Regional Connector
